共 21 条
- [1] Chen S., Song S., Li L., Et al., Survey on smart grid technology, Power System Technology, 33, 8, pp. 1-7, (2009)
- [2] Kong X., Zhao S., Jia H., Et al., Analysis of equipment and technology in smart grid development, Proceedings of the CSU-EPSA, 24, 2, pp. 21-26, (2012)
- [3] Zhao L., Gao J., Guo X., Discussion on intelligent electric power equipment, High Voltage Apparatus, 46, 12, pp. 1-4, (2010)
- [4] Liu B., Huang H., Tong Y., Et al., Electromagnetic compatibility detection system of electronic transformer based on disconnector switching operation, High Voltage Engineering, 44, 3, pp. 53-58, (2018)
- [5] Ji J., Yang Y., Yuan Y., Et al., Experimental analysis of EMC immunity for field installed intelligent equipment of intelligent substation, High Voltage Engineering, 41, 3, pp. 998-1007, (2015)
- [6] Zhao J., Chen W., Zhang J., Et al., Analysis on electromagnetic compatibility immunity requirements for secondary equipment during switching transient operations in intelligent substation, High Voltage Engineering, 41, 5, pp. 1687-1695, (2015)
- [7] Gang Y., He J.L., Mao B.C., Et al., Electromagnetic interference in control cables of substation caused by short circuit fault, International Conference on Power, pp. 980-984, (2002)
- [8] Ke H., Lee W.J., Chen M.S., Et al., Grounding techniques and induced surge voltage on the control signal cables, IEEE Transactions on Industry Applications, 34, 4, pp. 663-668, (1998)
- [9] Wu H., Jiao C., Cui X., Et al., Analysis and simulated experiment for port disturbance voltage due to switching operation in GIS substaion, High Voltage Engineering, 43, 10, pp. 3387-3395, (2017)
- [10] Cheng D., Failure of secondary equipment caused by ground potential rise and its prevention, East China Electric Power, 11, pp. 15-17, (1996)