Balancing optimization of U-shaped assembly lines based on stochastic chance constrained programming

被引:0
|
作者
Tang Q. [1 ]
Lin B. [1 ]
He X. [2 ]
Zhang L. [1 ]
Zhang C. [3 ]
Cao X. [4 ]
机构
[1] College of Mechanics and Automation, Wuhan University of Science and Technology, Wuhan
[2] College of Science, Wuhan University of Science and Technology, Wuhan
[3] School of Mechanical Science and Engineering, Huazhong University of Science and Technology, Wuhan
[4] Dongfeng Peugot Citroen Automation Co., Ltd., Wuhan
来源
| 1600年 / CIMS卷 / 22期
关键词
Balancing; Deterministic equivalent model; Multiple constraints; Stochastic processing time; U-shaped assembly lines;
D O I
10.13196/j.cims.2016.04.009
中图分类号
学科分类号
摘要
To reduce the productivity loss or frequent disruption due to processing time fluctuation in the stochastic U-shaped assembly line balancing of type-II, a precedence constraint was established so as to ensure the material flow between entrance and exit of the line. A bi-objective stochastic chance-constraint programming model was formulated with two goals of improving productivity and stability simultaneously. Owing to the properties such as randomness, non-linearity and intractability of the proposed model, the stochastic chance constraint related to processing times was transformed into its deterministic equivalent, two incompatible goals were normalized and combined, and two nonlinear constraints were linearized. Therefore, a mixed-integer linear programming model was achieved, which could be solved by GAMS/Cplex. Experimental results demonstrated that under the stochastic processing times, the proposed stochastic chance-constraint program model and its solution methodology could lead to a vast promotion in the production stablity at the cost of tiny productivity loss. © 2016, Editorial Department of CIMS. All right reserved.
引用
收藏
页码:955 / 964
页数:9
相关论文
共 19 条
  • [1] Baykasoglu A., Ozbakir L., Stochastic U-line balancing using genetic algorithms, The International Journal of Advanced Manufacturing Technology, 32, 1-2, pp. 139-147, (2007)
  • [2] Zheng Q., Li Y., Li M., Et al., Ant colony optimization for type-IIassembly line balancing problem, Computer Integrated Manufacturing Systems, 18, 5, pp. 999-1005, (2012)
  • [3] Li M., Li S., Xia X., Et al., Rules combination algorithm of assembly line balancing problem for large-scale multiple stations, Computer Integrated Manufacturing Systems, 19, 11, pp. 2780-2787, (2013)
  • [4] Miltenburg G.J., Wijngaard J., The U-line balancing problem, Management Science, 40, 10, pp. 1378-1388, (1994)
  • [5] Scholl A., Klein R., ULINO:optimally balancing U-shaped JIT assembly lines, International Journal of Production Research, 37, 4, pp. 721-736, (1999)
  • [6] Tong Y., Wu F., The heuristics for the U-line assembly line balancing problem, Journal of Nanjing University of Science and Technology, 24, 5, pp. 394-397, (2000)
  • [7] Klein R., Scholl A., Maximizing the production rate in simple assembly line balancing-a branch and bound procedure, European Journal of Operational Research, 91, 2, pp. 367-385, (1996)
  • [8] Gokcen H., Agpak K., Gencer C., Et al., A shortest route formulation of simple U-type assembly line balancing problem, Applied Mathematical Modeling, 29, 4, pp. 373-380, (2005)
  • [9] Gokcen H., Agpak K., A goal programming approach to simple U-line balancing problem, European Journal of Operational Research, 171, 2, pp. 577-585, (2006)
  • [10] Kara Y., Paksoy T., Chang C.T., Binary fuzzy goal programming approach to single model straight and U-shaped assembly line balancing, European Journal of Operational Research, 195, 2, pp. 335-347, (2009)