Study of High-Precision Main Cable Strand Manufacturing and Marking Erection Method for Suspension Bridge

被引:0
|
作者
Tang, Mao-Lin [1 ]
Song, Shen-You [2 ]
Li, Ze-Jun [1 ]
Zhang, Tai-Ke [3 ]
Wu, Ling-Zheng [3 ]
机构
[1] School of Civil Engineering, Southwest Jiaotong University, Chengdu,610031, China
[2] Shenzhen-Zhongshan Link Administration Center, Zhongshan,528400, China
[3] Guangdong Bay Area Traffic Construction Investment Co., Ltd., Guangzhou,510699, China
来源
Bridge Construction | 2022年 / 52卷 / 06期
关键词
Compendex;
D O I
暂无
中图分类号
学科分类号
摘要
Installation
引用
收藏
页码:16 / 24
相关论文
共 50 条
  • [1] Simulation Method of Main Cable Temperature for Suspension Bridge
    Wang, Ying
    Liu, Muyu
    [J]. PROCEEDINGS OF THE 5TH INTERNATIONAL CONFERENCE ON CIVIL ENGINEERING AND TRANSPORTATION 2015, 2016, 30 : 651 - 656
  • [2] New Method for Calculating Main Cable of Suspension Bridge
    Deng, Xiaokang
    Xu, Gongyi
    [J]. Tiedao Xuebao/Journal of the China Railway Society, 2019, 41 (05): : 133 - 141
  • [3] Method of high-precision calculation on the linear parameters for the stay-cable of the cable-stayed bridge
    Li, Xi
    Cai, Tingting
    [J]. SUSTAINABLE ENVIRONMENT AND TRANSPORTATION, PTS 1-4, 2012, 178-181 : 2144 - 2148
  • [4] Study on longitudinal restraint stiffness of main cable in suspension bridge
    School of Architecture and Civil Engineering, Xi'an University of Science and Technology, Xi'an
    Shaanxi
    710054, China
    不详
    200092, China
    不详
    Shaanxi
    710064, China
    [J]. Zongguo Gonglu Xuebao, 8 (59-66):
  • [5] The key quality control technology of main cable erection in long-span suspension bridge construction
    Chen, Yongrui
    Wei, Wei
    Dai, Jie
    [J]. 3RD INTERNATIONAL CONFERENCE ON ENERGY MATERIALS AND ENVIRONMENT ENGINEERING, 2017, 61
  • [6] Calculation method of main cable saddle of suspension bridge based on energy method
    Luan, Juan
    Hao, Xianwu
    Duan, Ruifang
    [J]. PROCEEDINGS OF THE 2016 4TH INTERNATIONAL CONFERENCE ON RENEWABLE ENERGY AND ENVIRONMENTAL TECHNOLOGY (ICREET 2016), 2017, 112 : 509 - 513
  • [7] High-precision calculation method for configuration of completed suspension bridges with pin-connected cable clamps
    Luo, Ling-Feng
    Shan, De-Shan
    Chen, Feng-Min
    Chen, Pin-Yi
    [J]. Gongcheng Lixue/Engineering Mechanics, 2021, 38 (08): : 133 - 144
  • [8] Study of Anticorrosion System and Anticorrosion Mechanism for the Main Cable of Suspension Bridge
    Chen, Wei
    Shen, Ruili
    Wang, Hui
    Gong, Wang
    [J]. JOURNAL OF BRIDGE ENGINEERING, 2021, 26 (12)
  • [9] IMPROVED HIGH-PRECISION MEASURING METHOD FOR BRIDGE CRANES
    GOESMANN, H
    [J]. STAHL UND EISEN, 1975, 95 (18): : 832 - 836
  • [10] Study on the Main Cable Curve of Suspension Bridge Based on the Improved Particle Swarm Optimization (IPSO) Method
    Wei, Zhaolan
    Shen, Minghui
    Song, Xiaodong
    Wang, Jian
    Lv, Mengting
    Jia, Shaomin
    Han, Peng
    [J]. APPLIED SCIENCES-BASEL, 2022, 12 (11):