Agent-based project scheduling

被引:21
|
作者
机构
[1] Knotts, Gary
[2] Dror, Moshe
[3] Hartman, Bruce C.
来源
Knotts, Gary | 2000年 / Kluwer Academic Publishers, Dordrecht, Netherlands卷 / 32期
关键词
Algorithms - Constraint theory - Operations research - Problem solving - Resource allocation;
D O I
10.1023/A:1007666324223
中图分类号
学科分类号
摘要
Agent technology offers a new way of thinking about many of the classic problems in operations research. Among these are problems such as project scheduling subject to resource constraints. In this paper, we develop and experimentally evaluate eight agent-based algorithms for solving the multimode, resource-constrained project scheduling problem. Our algorithms differ in the priority rules used to control agent access to resources. We apply our approach to a 51-activity project originally published by Maroto and Tormos. We solve the problem using two types of agent-based systems: (i) a system of simple, reactive agents that we call basic agents; and (ii) a system of more complex, deliberative agents that we call enhanced agents. Of the eight priority rules tested, we find that priority based on shortest processing time performs best in terms of schedule quality when applied by basic agents while the priority based on earliest due date performs best when applied by enhanced agents. In comparing agents across priority rules, we find that enhanced agents generate much better schedules (with makespans up to 66% shorter in some cases) and require only slightly more computation time.
引用
收藏
相关论文
共 50 条
  • [1] Agent-based project scheduling
    Knotts, G
    Dror, M
    Hartman, BC
    [J]. IIE TRANSACTIONS, 2000, 32 (05) : 387 - 401
  • [2] A (μ, λ)-coordination mechanism for agent-based multi-project scheduling
    Homberger, Joerg
    [J]. OR SPECTRUM, 2012, 34 (01) : 107 - 132
  • [3] An agent-based system for multi-project planning and scheduling
    Li, Jinghua
    Liu, Wenjian
    [J]. 2005 IEEE INTERNATIONAL CONFERENCE ON MECHATRONICS AND AUTOMATIONS, VOLS 1-4, CONFERENCE PROCEEDINGS, 2005, : 659 - 664
  • [4] An agent-based evolutionary strategic negotiation for project dynamic scheduling
    Chen, Yee-Ming
    Wang, Shih-Chang
    [J]. INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2007, 35 (3-4): : 333 - 348
  • [5] An agent-based evolutionary strategic negotiation for project dynamic scheduling
    Yee-Ming Chen
    Shih-Chang Wang
    [J]. The International Journal of Advanced Manufacturing Technology, 2007, 35 : 333 - 348
  • [6] A (μ, λ)-coordination mechanism for agent-based multi-project scheduling
    Jörg Homberger
    [J]. OR Spectrum, 2012, 34 : 107 - 132
  • [7] Agent-based project scheduling: computational study of large problems
    Knotts, G
    Dror, M
    [J]. IIE TRANSACTIONS, 2003, 35 (02) : 143 - 159
  • [8] Agent-based approach to solving the resource constrained project scheduling problem
    Jedrzejowicz, Piotr
    Ratajczak-Ropel, Ewa
    [J]. ADAPTIVE AND NATURAL COMPUTING ALGORITHMS, PT 1, 2007, 4431 : 480 - +
  • [9] Agent-based airline scheduling
    Langerman, JJ
    Ehlers, EM
    [J]. COMPUTERS & INDUSTRIAL ENGINEERING, 1997, 33 (3-4) : 849 - 852
  • [10] Development of an agent-based system for collaborative multi-project planning and scheduling
    Li, JH
    Liu, WJ
    [J]. PROCEEDINGS OF 2005 INTERNATIONAL CONFERENCE ON MACHINE LEARNING AND CYBERNETICS, VOLS 1-9, 2005, : 119 - 124