Analysis of the Stress Characteristics and Rock Burst of Ultra Deep Buried Tunnel in Sichuan-Tibet Railway

被引:0
|
作者
机构
[1] Wang, Dong
[2] Lin, Tian-Bin
[3] Jiang, Liang-Wen
[4] Lin, Zhi-Heng
[5] Feng, Tao
来源
Wang, Dong | 1600年 / Editorial Department of Journal of Railway Engineering Society, China卷 / 34期
关键词
Design and construction - Maximum principal stress - Numerical simulation analysis - Railway route selection - Stability of surrounding rock - Stress characteristics - Stress distribution characteristics - Ultra deeps;
D O I
暂无
中图分类号
学科分类号
摘要
Research purposes: Ultra deep buried tunnel of Zheduoshan is the controlling key porject of Chengdu to Kangding Railway, which is located in the western section of Chinese famous Y shaped tectonic wedge position. The characteristics of ground stress and rock burst analysis are of great significance for railway route selection, design and construction. In this paper, the Sichuan-Tibet Railway Chengdu to Kangding control engineering of Zheduoshan tunnel as an example, through the data of ground stress test and numerical simulation to analyze the stress distribution characteristics of Zheduoshan tunnel area, and achieve the direction of the maximum principal stress. And through the tunnel rock stress-strain curve under uniaxial loading-unloading to calculate the tendency index of tunnel rock burst, analysis the rock mechanics index of rock burst. Finally, through the deep-hole drilling results, rock mechanics test, numerical simulation analysis and hydrological experiment to analyze Zheduoshan tunnel stress and the rock burst strength. Research conclusions: (1)The maximum principal stress of Zheduoshan tunnel is horizontal stress and the direction is NEE, the measured maximum value is 17 MPa, the maximum numerical simulation' value is 48 MPa; (2)From the analysis of rock burst tendency index test, the surrounding rock has the energy storage and release conditions of the medium to intense rock burst. (3)Through comprehensive analysis, the medium to intense rock burst of Zhuoduoshan tunnel is possible to occur. (4)The research results can provide a basis for the design of the tunnel, and also provide reference for the stability of surrounding rock. © 2017, Editorial Department of Journal of Railway Engineering Society. All right reserved.
引用
收藏
相关论文
共 50 条
  • [1] Research on the Rock Burst Prediction of a Tunnel in Sichuan-Tibet Railway Based on Microseismic Monitoring
    Han, Kan
    Chen, Xianfeng
    Yang, Wenbin
    Wang, Bingyong
    Journal of Railway Engineering Society, 2020, 37 (11) : 90 - 95
  • [2] Analysis and Thoughts on Surrounding Rock Mass Catastrophe of Deep-buried Tunnels Along Sichuan-Tibet Railway
    Xie H.
    Zhang R.
    Ren L.
    Zhang A.
    Zhang Z.
    Deng J.
    Xu Z.
    Zhang G.
    Feng T.
    Wang D.
    Wang Z.
    Yi X.
    Lin Z.
    Li J.
    Zhang Z.
    Yuan D.
    Jia Z.
    Gongcheng Kexue Yu Jishu/Advanced Engineering Sciences, 2022, 54 (02): : 1 - 20
  • [3] Application of Ultra-deep Directional Drilling Technology in the Investigation of Sichuan-Tibet Railway Tunnel
    Xu, Zhengxuan
    Liu, Jianguo
    Wu, Jinsheng
    Feng, Tao
    Chen, Minghao
    Wang, Yandong
    Yuan, Dong
    Gongcheng Kexue Yu Jishu/Advanced Engineering Sciences, 2022, 54 (02): : 21 - 29
  • [4] Cooling Technology and Effect Analysis for High Geothermal Tunnel on Sichuan-Tibet Railway
    Yan J.
    He C.
    Zeng Y.
    Wang B.
    Zhang J.
    Zhongguo Tiedao Kexue/China Railway Science, 2019, 40 (05): : 53 - 62
  • [5] Application of IPP-PNN model in rockburst prediction occurring deep-buried long tunnel of Sichuan-Tibet Railway
    Jin C.
    Dang D.
    Gong L.
    Qi Y.
    Jia Z.
    Journal of Railway Science and Engineering, 2023, 20 (03) : 986 - 995
  • [6] Prevention and Control Method for Typical Rock Burst Disaster in Lhasa-Linzhi Section Tunnel of Sichuan-Tibet Railway and Its Application
    Tian S.
    Zhao Y.
    Shi S.
    Qiao Z.
    Wang W.
    Zhongguo Tiedao Kexue/China Railway Science, 2020, 41 (06): : 71 - 80
  • [7] Scientific problems and research proposals for Sichuan-Tibet railway tunnel construction
    Zhang, Dingli
    Sun, Zhenyu
    Fang, Qian
    UNDERGROUND SPACE, 2022, 7 (03) : 419 - 439
  • [8] Application of Airborne Electromagnetic Method in Tunnel Exploration in Sichuan-Tibet Railway
    Li, Jian
    Journal of Railway Engineering Society, 2020, 37 (04) : 1 - 5
  • [9] System Modeling and Risk Analysis of the Sichuan-Tibet Railway Project
    Yu, Xiuzhen
    Mou, Ruifang
    JOURNAL OF TRANSPORTATION ENGINEERING PART A-SYSTEMS, 2021, 147 (12)
  • [10] Cause Analysis of Geothermal Water and Geological Route Selection Research on the Sangzhuling Tunnel of Sichuan-Tibet Railway
    He, Ping
    Zhang, Guangze
    Qiang, Xingang
    Journal of Railway Engineering Society, 2020, 37 (06) : 10 - 13