Construction of deep tunnels for hydraulic use. The Cheves Hydropower Plant (Peru)

被引:0
|
作者
Moreno, Marcos Sancho [1 ]
González, María Boisán [1 ]
Marqués, Santiago Veyrat [1 ]
Fernández, Jose Miguel Galera [1 ]
机构
[1] Subterra Ingeniería, Spain
来源
Revista de Obras Publicas | 2015年 / 162卷 / 3568期
关键词
D O I
暂无
中图分类号
学科分类号
摘要
The main and special problems related to the design and construction of tunnels and caverns with high overburden are analysed in this paper. As an example, the recent experiences during the construction of Cheves Hydropower Project in the Peruvian Andes are described.