共 50 条
- [4] Two-machine No-wait Flowshop Scheduling with Availability Constraints and Release Dates [J]. CIE: 2009 INTERNATIONAL CONFERENCE ON COMPUTERS AND INDUSTRIAL ENGINEERING, VOLS 1-3, 2009, : 170 - 175
- [8] Two-machine no-wait flowshop scheduling problem with uncertain setup times to minimize maximum lateness [J]. COMPUTATIONAL & APPLIED MATHEMATICS, 2018, 37 (05): : 6774 - 6794
- [9] Two-machine no-wait flowshop scheduling problem with uncertain setup times to minimize maximum lateness [J]. Computational and Applied Mathematics, 2018, 37 : 6774 - 6794
- [10] Two-machine flow shop no-wait scheduling with machine maintenance [J]. 4OR, 2005, 3 (4) : 303 - 313