Properties of two-machine no-wait flowshop scheduling problems

被引:0
|
作者
Chen, Ke-Jia [1 ]
Wang, Xiao [1 ]
机构
[1] School of Management, Fuzhou University, Fuzhou 350108, China
来源
Kongzhi yu Juece/Control and Decision | 2013年 / 28卷 / 10期
关键词
D O I
暂无
中图分类号
学科分类号
摘要
引用
收藏
页码:1502 / 1506
相关论文
共 50 条
  • [1] Approximability of two-machine no-wait flowshop scheduling with availability constraints
    Cheng, TCE
    Liu, ZH
    [J]. OPERATIONS RESEARCH LETTERS, 2003, 31 (04) : 319 - 322
  • [2] Batch scheduling in the no-wait two-machine flowshop to minimize the makespan
    Lin, BMT
    Cheng, TCE
    [J]. COMPUTERS & OPERATIONS RESEARCH, 2001, 28 (07) : 613 - 624
  • [3] Heuristics for two-machine no-wait flowshop scheduling with an availability constraint
    Wang, GQ
    Cheng, TCE
    [J]. INFORMATION PROCESSING LETTERS, 2001, 80 (06) : 305 - 309
  • [4] Two-machine No-wait Flowshop Scheduling with Availability Constraints and Release Dates
    Ben Chihaoui, Faten
    Dridi, Najoua
    Hadj-Alouane, Atidel B.
    [J]. CIE: 2009 INTERNATIONAL CONFERENCE ON COMPUTERS AND INDUSTRIAL ENGINEERING, VOLS 1-3, 2009, : 170 - 175
  • [5] Two-machine flow shop scheduling problems with no-wait jobs
    Bouquard, JL
    Billaut, JC
    Kubzin, MA
    Strusevich, VA
    [J]. OPERATIONS RESEARCH LETTERS, 2005, 33 (03) : 255 - 262
  • [6] 3/2-approximation for two-machine no-wait flowshop scheduling with availability constraints
    Cheng, TCE
    Liu, ZH
    [J]. INFORMATION PROCESSING LETTERS, 2003, 88 (04) : 161 - 165
  • [7] A note on minimizing maximum lateness in a two-machine no-wait flowshop
    Dileepan, P
    [J]. COMPUTERS & OPERATIONS RESEARCH, 2004, 31 (12) : 2111 - 2115
  • [8] Two-machine no-wait flowshop scheduling problem with uncertain setup times to minimize maximum lateness
    Allahverdi, Ali
    Allahverdi, Muberra
    [J]. COMPUTATIONAL & APPLIED MATHEMATICS, 2018, 37 (05): : 6774 - 6794
  • [9] Two-machine no-wait flowshop scheduling problem with uncertain setup times to minimize maximum lateness
    Ali Allahverdi
    Muberra Allahverdi
    [J]. Computational and Applied Mathematics, 2018, 37 : 6774 - 6794
  • [10] Two-machine flow shop no-wait scheduling with machine maintenance
    Kubzin M.A.
    Strusevich V.A.
    [J]. 4OR, 2005, 3 (4) : 303 - 313