Cut-off wall construction

被引:0
|
作者
International Division, Bauer Spezialtiefbau GmbH [1 ]
机构
来源
Int. Water Power Dam Constr. | 2007年 / 2卷 / 42-44期
关键词
Dams;
D O I
暂无
中图分类号
学科分类号
摘要
引用
收藏
页码:42 / 44
相关论文
共 50 条
  • [1] Completing cut-off wall construction
    Spezialtiefbau, Bauer
    International Water Power and Dam Construction, 2015, 67 (10): : 22 - 24
  • [2] Study on the construction of concrete cut-off wall and the detection technology
    Jiang, Zhenzhong
    Gao, Zhongpu
    Zhang, Liangxiu
    Shuili Fadian/Water Power, (03): : 32 - 35
  • [3] Construction experience of concrete cut-off wall in Xiaolangdi dam project
    Li, Ligang
    Yantu Gongcheng Xuebao/Chinese Journal of Geotechnical Engineering, 1999, 21 (05): : 625 - 627
  • [4] Design and Construction of the Rockfill Dams and the Cut-off Wall at the Merowe Project
    Ehrhardt, Thomas
    Scheid, Yannick
    El Tayeb, Ahmed
    WASSERWIRTSCHAFT, 2011, 101 (1-2) : 36 - 42
  • [5] Cut-off Wall Technologies in Mining
    Schwank, Stefan
    MINING MEETS WATER - CONFLICTS AND SOLUTIONS, 2016, : 468 - 477
  • [6] Cut-off wall construction using Cutter Soil Mixing: a case study
    Arnold, Michael
    Beckhaus, Karsten
    Wiedenmann, Ulli
    GEOTECHNIK, 2011, 34 (01) : 11 - 21
  • [7] Analyses on technical issues on water cut-off wall construction in flowing water
    Qing, Yuyan
    Coal Science and Technology (Peking), 1994, 22 (09):
  • [8] Cut-off wall, diaphragm wall, piling and grouting works for the construction oftheJannah Dam in Lebanon
    Adnan, Mazin
    Baltruschat, Michael
    Abdo, Georges
    WASSERWIRTSCHAFT, 2023, 113 (06) : 48 - 51
  • [9] Construction and performance of the Karkheh dam complementary cut-off wall: an innovative engineering solution
    Heidarzadeh, Mohammad
    Mirghasemi, Ali A.
    Niroomand, Habib
    Eslamin, Faramarz
    INTERNATIONAL JOURNAL OF CIVIL ENGINEERING, 2019, 17 (6B) : 859 - 869
  • [10] Construction and performance of the Karkheh dam complementary cut-off wall: an innovative engineering solution
    Mohammad Heidarzadeh
    Ali A. Mirghasemi
    Habib Niroomand
    Faramarz Eslamin
    International Journal of Civil Engineering, 2019, 17 : 859 - 869