共 50 条
- [2] MODELLING OF AT ROCKBOLTS PARAMETERS FOR "SOKO" UNDERGROUND COAL MINE [J]. TEHNICKI VJESNIK-TECHNICAL GAZETTE, 2016, 23 (03): : 661 - 666
- [3] Probabilistic Modeling of Mining Production in an Underground Coal Mine [J]. INTELLIGENT SYSTEMS IN PRODUCTION ENGINEERING AND MAINTENANCE, 2019, 835 : 655 - 667
- [4] Research on Underground Coal Mine Production Process Anlysis and Informatization [J]. ACHIEVEMENTS IN ENGINEERING MATERIALS, ENERGY, MANAGEMENT AND CONTROL BASED ON INFORMATION TECHNOLOGY, PTS 1 AND 2, 2011, 171-172 : 278 - 282
- [5] Optimisation in the design of underground mine access [J]. Orebody Modelling and Strategic Mine Planning: Uncertainty and Risk Management Models, 2005, (14): : 121 - 124
- [6] Modern underground drilling rigs and their effect on mine production and preparation [J]. 9th AusIMM Underground Operators Conference 2005, 2005, 2005 (01): : 111 - 115
- [7] UNDERGROUND COAL BUNKER INCREASES MINE PRODUCTION BY 800 TONS DAILY [J]. COAL AGE, 1985, 90 (09): : 70 - 73
- [8] Constrained path optimisation for underground mine layout [J]. WORLD CONGRESS ON ENGINEERING 2007, VOLS 1 AND 2, 2007, : 856 - +
- [10] Diesel Aerosols in an Underground Coal Mine [J]. Mining, Metallurgy & Exploration, 2022, 39 : 937 - 945