Selection and Experimental Research of the Passive Start-Up Neutron Detector in Nuclear Power Plant

被引:0
|
作者
Jiang, Tianzhi [1 ,2 ]
Li, Biao [3 ]
Zhang, Yun [2 ]
Wang, Yinli [2 ]
Li, Wenping [2 ]
Huang, Youjun [2 ]
Shen, Feng [2 ]
Sun, Congjian [2 ]
机构
[1] College of Automation Engineering, University of Electronic Science and Technology, Chengdu,611731, China
[2] Science and Technology on Reactor System Design Technology Laboratory, Nuclear Power Institute of China, Chengdu,610213, China
[3] China Nuclear Control System Engineering Co., Ltd., Beijing,100176, China
来源
关键词
Fission reactions - Neutron detectors - Neutrons - Nuclear energy - Nuclear fuels - Nuclear power plants - Plant shutdowns;
D O I
暂无
中图分类号
学科分类号
摘要
In order to monitor the reactor core during the first cycle charging, shutdown and start-up of nuclear power plants, domestic and foreign nuclear power plants generally introduce two primary neutron source components in the core, but the primary neutron sources are imported from the United States, which has the problem of import limitations. In order to solve this problem, it is studied to cancel the primary neutron source component in the first cycle and use the neutrons produced by the spontaneous fission of the fuel assembly as the starting neutron source. The neutron intensity produced by spontaneous fission of fuel assembly is much lower than that of primary neutron source. In view of the above situation, it is necessary to use a higher sensitivity detector to monitor the neutron fluence rate outside the reactor. Based on the analysis of the basic principles of various high-sensitivity detectors, this paper gives suggestions on the selection of high-sensitivity neutron detectors, and verifies their performance by experiments. The experiment results show that even when the γ dose rate is greater than 0.1 Gy/h, the 3He proportional counter tube can be set with an appropriate discriminating voltage, and can effectively discriminate γ noise. The maximum γ dose rate verified by the experiment is 1.0 Gy/h. © 2022, Editorial Board of Journal of Nuclear Power Engineering. All right reserved.
引用
收藏
页码:139 / 143
相关论文
共 50 条
  • [1] Study on start-up characteristics of passive containment cooling system for underground nuclear power plant
    Science and Technology on Reactor System Design Technology Laboratory, Nuclear Power Institute of China, Chengdu
    610213, China
    不详
    430010, China
    [J]. Hedongli Gongcheng, 4 (121-124):
  • [2] START-UP PROGRAM OF ROBERT EMMENT GINNA NUCLEAR POWER PLANT
    POWELL, E
    [J]. ATOM & STROM, 1970, 16 (3-4): : 72 - &
  • [3] Simulation of the start-up of a hydro power plant for the emergency power supply of a nuclear power station
    Lindenmeyer, D
    Moshref, A
    Schaeffer, C
    Benge, A
    [J]. IEEE TRANSACTIONS ON POWER SYSTEMS, 2001, 16 (01) : 163 - 169
  • [4] Plant start-up
    不详
    [J]. NUCLEAR PLANT JOURNAL, 1996, 14 (02) : 6 - 6
  • [5] Successful start-up for pilot hydrogen power plant
    不详
    [J]. TCE, 2005, (765): : 5 - 5
  • [6] 11 CHECKPOINTS FOR POWER-PLANT START-UP
    RICHARDSON, DC
    [J]. POWER ENGINEERING, 1983, 87 (11) : 52 - 54
  • [7] Sulfur plant start-up
    Hudson, Hank
    Grigson, Susan
    [J]. Hydrocarbon Engineering, 2002, 7 (02):
  • [8] EQUIPMENT PLANT START-UP
    MARPLE, DD
    [J]. WATER-ENGINEERING & MANAGEMENT, 1981, : 31 - 32
  • [9] Deterministic and stochastic computational models for the analysis of Nuclear Power Plant (NPP) start-up operations
    Gordon, T. L.
    Cooling, C. M.
    Williams, M. M. R.
    Eaton, M. D.
    Sutton, T. M.
    Haigh, P.
    Morgan, G. O.
    Bean, P. S.
    [J]. NUCLEAR ENGINEERING AND DESIGN, 2024, 428
  • [10] Itô-calculus based mathematical models for stochastic nuclear reactor kinetics and dynamics simulations of low neutron source nuclear power plant (NPP) start-up
    Gordon, T. L.
    Williams, M. M. R.
    Eaton, M. D.
    Haigh, P.
    [J]. ANNALS OF NUCLEAR ENERGY, 2024, 202