Construction monitoring techniques for foundation pit of west anchorage of Nizhou waterway bridge of second Humen Birdge

被引:0
|
作者
机构
[1] [1,Zhu, Zhi-Bao
来源
Zhu, Zhi-Bao (248941928@qq.com) | 1600年 / Wuhan Bridge Research Institute卷 / 46期
关键词
12;
D O I
暂无
中图分类号
学科分类号
摘要
引用
收藏
相关论文
共 4 条
  • [1] Hoisting and Installation Construction Technology for Main Cable Saddle of Nizhou Waterway Bridge of Second Humen Bridge
    虎门二桥坭洲水道桥主索鞍吊装施工技术
    2018, Wuhan Bridge Research Institute (48)
  • [2] Study on Longitudinal Constraint System of Nizhou Waterway Bridge of Second Humen Bridge
    Zhang, Xin-Min
    Xu, Yuan-Qing
    Lu, Li-Tao
    Li, Chong
    Bridge Construction, 2019, 49 (02) : 7 - 12
  • [3] Key Foundation Construction Techniques for South Anchorage of Xianxin Road Changjiang River Bridge in Nanjing
    Guo, Jiajia
    Zhang, Guohao
    Zong, Jiaqi
    Li, Jian
    Guo, Shifeng
    Bridge Construction, 2024, 54 (06) : 9 - 15
  • [4] Key Construction Techniques for Foundation Pit Supporting Structure of East Anchor Block of Lingdingyang Bridge
    Yao, Zhi-An
    Chen, Bing-Yao
    Bridge Construction, 2020, 50 (03) : 105 - 110