共 50 条
- [1] Optimal Control for a Cascade of Hydroelectric Power Stations: Case Study [J]. CONTROLO'2014 - PROCEEDINGS OF THE 11TH PORTUGUESE CONFERENCE ON AUTOMATIC CONTROL, 2015, 321 : 147 - 156
- [2] Optimising a cascade of hydroelectric power stations with the WOLF package [J]. WATER RESOURCES MANAGEMENT II, 2003, 8 : 65 - 74
- [6] Contract power output of the cascade power stations on the upper Hanjiang River [J]. Shuili Fadian Xuebao/Journal of Hydroelectric Engineering, 2011, 30 (04): : 246 - 252
- [7] Research on ecological impacts of the joint operation of cascade reservoirs in the upstream of the Yellow River [J]. Shuili Xuebao/Journal of Hydraulic Engineering, 2018, 49 (10): : 1187 - 1198
- [8] Study of genetic algorithm based automatic generation control for cascade hydroelectric stations [J]. Progress in Intelligence Computation & Applications, 2005, : 97 - 102
- [9] Study on the Contribution of CO2 Emission Reducing of Yellow River Upstream LONGyangxia and LIUjiaxia Cascade Reservoirs [J]. INTERNATIONAL CONFERENCE ON APPLIED PHYSICS AND INDUSTRIAL ENGINEERING 2012, PT A, 2012, 24 : 217 - 224
- [10] Multiobjective feedback control and its application to the construction of control rules for a cascade of hydroelectric power stations [J]. TRUDY INSTITUTA MATEMATIKI I MEKHANIKI URO RAN, 2014, 20 (04): : 187 - 203