Optimal scheduling of smart home appliances with a stochastic power outage: A two-stage stochastic programming approach

被引:1
|
作者
Malekkhani, Zahra [1 ]
Ranjbar, Mohammad [1 ]
机构
[1] Ferdowsi Univ Mashhad, Fac Engn, Dept Ind Engn, Mashhad, Iran
来源
关键词
Smart home; Scheduling; Power outage management; Renewable energy; Two-stage stochastic programming; Sample average approximation; ENERGY MANAGEMENT; RENEWABLE ENERGY; DEMAND RESPONSE; OPTIMIZATION; MODEL;
D O I
10.1016/j.segan.2024.101564
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
This study primarily concentrates on enhancing the scheduling of electric appliances within a smart home equipped with a photovoltaic solar array and a storage battery capable of redistributing excess electricity to the grid. Furthermore, the investigation takes into consideration the unpredictability of a power outage, analyzing the scheduling of these appliances to minimize consumer electricity expenses. To tackle this issue, a two-stage stochastic programming methodology is developed to effectively model the uncertainty surrounding both the onset time and duration of power outages. Additionally, a sample average approximation algorithm (SAA) is devised to efficiently address the problem. Through extensive computational experiments, the outcomes demonstrate that the SAA yields shorter CPU processing times, albeit without guaranteeing optimal solutions. The total average percent deviation of the SAA's upper bound from its lower bound and the optimal solution stands at 4.16 % and 4.5 %, respectively. Moreover, it is demonstrated that utilizing the stochastic approach, as opposed to the deterministic one, can enhance solution quality by 6.2 %. Furthermore, a comprehensive sensitivity analysis is provided, focusing on probability distribution functions of outage start time and duration, alongside an analysis of the solar panel and battery storage capacities. It is revealed that when adopting a Normal distribution instead of a Uniform distribution, the performance of the SAA experiences a slight decline.
引用
收藏
页数:14
相关论文
共 50 条
  • [1] Optimal Nursing Home Shift Scheduling: A Two-Stage Stochastic Programming Approach
    Jiang, Shujin
    Li, Mingyang
    Hyer, Kathryn
    Kong, Nan
    2020 IEEE 16TH INTERNATIONAL CONFERENCE ON AUTOMATION SCIENCE AND ENGINEERING (CASE), 2020, : 132 - 137
  • [2] A Two-stage Stochastic Programming Method for Optimal Power Scheduling with Solar Power Integration
    Han Hanhuawei
    Wang Chunli
    Jiang Weiwei
    Shi Ning
    Li Chuankun
    Gao Xinjiang
    Wang Haozhi
    2017 CHINESE AUTOMATION CONGRESS (CAC), 2017, : 2041 - 2047
  • [3] A Two-Stage Stochastic Mixed-Integer Programming Approach to the Smart House Scheduling Problem
    Ozoe, Shunsuke
    Tanaka, Yoichi
    Fukushima, Masao
    ELECTRICAL ENGINEERING IN JAPAN, 2014, 186 (04) : 48 - 58
  • [4] A two-stage stochastic programming project scheduling approach to production planning
    Alfieri, Arianna
    Tolio, Tullio
    Urgo, Marcello
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2012, 62 (1-4): : 279 - 290
  • [5] A two-stage stochastic programming project scheduling approach to production planning
    Arianna Alfieri
    Tullio Tolio
    Marcello Urgo
    The International Journal of Advanced Manufacturing Technology, 2012, 62 : 279 - 290
  • [6] Appointment Scheduling at Outpatient Clinics Using Two-Stage Stochastic Programming Approach
    Anvaryazdi, Samira Fazel
    Venkatachalam, Saravanan
    Chinnam, Ratna Babu
    IEEE ACCESS, 2020, 8 : 175297 - 175305
  • [7] A two-stage stochastic programming approach for multi-activity tour scheduling
    Restrepo, Maria I.
    Gendron, Bernard
    Rousseau, Louis-Martin
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2017, 262 (02) : 620 - 635
  • [8] A Two-stage Stochastic Programming Model for Outpatient Appointment Scheduling
    Ma Shuang
    Chen Songlin
    Cai Xiaotian
    2019 IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT (IEEM), 2019, : 79 - 83
  • [9] Two-Stage Stochastic Power Generation Scheduling in Microgrids
    Eajal, A. A.
    El-Saadany, E. F.
    Elrayani, Yousef
    Ponnambalam, K.
    2014 IEEE 27TH CANADIAN CONFERENCE ON ELECTRICAL AND COMPUTER ENGINEERING (CCECE), 2014,
  • [10] A two-stage stochastic programming approach to employee scheduling in retail outlets with uncertain demand
    Parisio, Alessandra
    Jones, Colin Neil
    OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE, 2015, 53 : 97 - 103