Challenges in the system engineering of a Precise Timing Facility for NavIC

被引:3
|
作者
Bhardwajan, Aakanksha Avnish [1 ]
Arora, Anu [1 ]
Dakkumalla, Suresh [1 ]
Ganesh, T Subramanya [1 ]
Ramakrishna, B.N. [1 ]
机构
[1] ISRO Telemetry Tracking and Command Network, Indian Space Research Organisation, Plot 12 & 13, 3, rd, Main, 2, nd, Phase, Peenya Industrial Area, Bangalore, India
关键词
Atomic clocks - Chemical laboratories - Computer software selection and evaluation - Continuous time systems - Error correction - Model checking - Requirements engineering - Research laboratories - Research reactors - Software design - Software testing - Temperature scales;
D O I
10.1002/j.2334-5837.2019.00687.x
中图分类号
学科分类号
摘要
At the heart of the NavIC/IRNSS ground segment is the IRNSS Network Timing (IRNWT) facility, a precise timing facility (PTF), responsible for the generation, maintenance and dissemination of the IRNSS system time. This paper dwells on the challenges in the system engineering of such a complex system. A PTF has two major applications namely metrological timekeeping and navigation timekeeping for precise orbit determination and time synchronization (OD&TS). These two different objectives in turn translate to two different sets of requirements such as long-term frequency stability and accuracy for metrological timekeeping, while short and medium term frequency stability and high availability of timescale for navigation. At first, these high level requirements need to be translated to a comprehensive design with minute level operational and performance specifications. The design needs to ensure high availability of the system by creating an ensemble of different kinds of atomic clocks while at the same time maintain frequency stability and optimization for various noise processes dominant at different averaging intervals. The design also need to ensure accuracy of the generated timescale with respect to a desired reference such as UTC needs to be ensured with regular time transfers either by Common-view or Two-way satellite time and frequency transfer. In the next step, the design is implemented with the appropriate selection of hardware and software elements. The system engineering of a PTF thus involves varied and multi-disciplinary facets such as selection of atomic clocks, development of ensemble algorithms, steering the generated timescale signal to the desired reference, monitoring and control of all the hardware and software involved and designing of facility including appropriate environmental conditions. The next step is the verification and validation of the realized system. This step needs to ensure that the system is tested for a sufficiently long period of times to assess both short term and long term performance of the system before it is declared operational. Three such systems have now been made operational in India for NavIC. Copyright © 2019 by ISTRAC/ISRO. Permission granted to INCOSE to publish and use.
引用
收藏
页码:302 / 313
相关论文
共 50 条
  • [1] The Galileo Precise Timing Facility
    Zanello, Renzo
    Mascarello, Marco
    Tavella, Patrizia
    Galleani, Lorenzo
    Detoma, Edoardo
    Bellotti, Angelo
    [J]. PROCEEDINGS OF THE 2007 IEEE INTERNATIONAL FREQUENCY CONTROL SYMPOSIUM-JOINTLY WITH THE 21ST EUROPEAN FREQUENCY AND TIME FORUM, VOLS 1-4, 2007, : 458 - +
  • [2] Design and development of a precise time scale system for NavIC
    [J]. 2017, ISRO Satellite Centre (28):
  • [3] Implementing the Galileo Precise Timing Facility
    Zanello, Renzo
    Blanchi, Marco
    Piras, Chiara
    Detoma, Edoardo
    Capetti, Paola
    Bellotti, Angelo
    Villabruna, Diego
    [J]. 2009 JOINT MEETING OF THE EUROPEAN FREQUENCY AND TIME FORUM AND THE IEEE INTERNATIONAL FREQUENCY CONTROL SYMPOSIUM, VOLS 1 AND 2, 2009, : 647 - +
  • [4] Performance results of the Galileo Precise Timing Facility
    Proia, A.
    Bourgeolet, F.
    d'Heeger, A.
    Salgado, G.
    Morante, Q.
    Varriale, E.
    Siccardi, M.
    Sanchez-Gestido, M.
    Ballereau, A.
    Schlarmann, B. Kl.
    [J]. 2014 European Frequency and Time Forum (EFTF), 2014, : 463 - 467
  • [5] Performance results of the Galileo Precise Timing Facility
    Morante, Quirino
    Cretoni, Daniele
    Putorti, Giulia
    Varriale, Enrico
    Bianchi, Marco
    Cantelmo, Claudio
    Baig, Jordi Fontdecaba
    Nogues, Jean Francois
    Aouad, Anas Tajdine
    Siccardi, Marco
    Mudrack, Alexander
    Schlarmann, Bernhard
    [J]. 2016 IEEE METROLOGY FOR AEROSPACE (METROAEROSPACE), 2016, : 484 - 488
  • [6] First performance results of the Galileo Precise Timing Facility
    Proia, Amandine
    Bourgeolet, Franck
    d'Heeger, Arnauld
    Salgado, Guillermo
    Morante, Quirino
    Piras, Chiara
    Siccardi, Marco
    Sanchez-Gestido, Manuel
    Ballereau, Alexandre
    Schlarmann, Bernhard Kl.
    [J]. PROCEEDINGS OF THE 45TH ANNUAL PRECISE TIME AND TIME INTERVAL SYSTEMS AND APPLICATIONS MEETING, 2013, : 250 - +
  • [7] Precise trigger timing system
    Huang, Sheng-Li
    Xu, Zi-Zong
    Wang, Zhao-Min
    Wang, Xiao-Lian
    Li, Cheng
    Chen, Hong-Fang
    Wu, Jian
    Zeng, Hui
    [J]. Kao Neng Wu Li Yu Ho Wu Li/High Energy Physics and Nuclear Physics, 2002, 26 (09):
  • [8] A precise trigger timing system
    Huang, SL
    Xu, ZZ
    Wang, ZM
    Wang, XL
    Li, C
    Chen, HF
    Wu, J
    Zeng, H
    [J]. HIGH ENERGY PHYSICS AND NUCLEAR PHYSICS-CHINESE EDITION, 2002, 26 (09): : 959 - 963
  • [9] Backup Hydrogen Maser steering algorithm for Galileo Precise Timing Facility
    Wang, Qinghua
    Rochat, Pascal
    [J]. PROCEEDINGS OF THE 2007 IEEE INTERNATIONAL FREQUENCY CONTROL SYMPOSIUM-JOINTLY WITH THE 21ST EUROPEAN FREQUENCY AND TIME FORUM, VOLS 1-4, 2007, : 463 - 466
  • [10] Timing performance and stability characterization of an In house realized NavIC Timing Receiver
    Dakkumalla, Suresh
    Bhardwajan, Aakanksha Avnish
    Dubey, Prem Ranjan
    Sadasivan, Rajath
    Ganesh, T. Subramanya
    Raghavendra, M. R.
    [J]. 2022 URSI REGIONAL CONFERENCE ON RADIO SCIENCE, USRI-RCRS, 2022, : 218 - 220