共 50 条
- [2] Tunnel rescue concept on the new Cologne-Rhine/Main line Eisenbahningenieur, 2002, 53 (11): : 26 - 27
- [3] Cologne-Rhine/Main line of the PBKAL Project Revista de Obras Publicas, 2000, 147 (3396): : 7 - 18
- [4] Sprayed concrete for the new Cologne-Rhine/Main express railway line SHOTCRETE TECHNOLOGY, 1999, : 11 - 22
- [5] New Cologne- Rhine/Main line: Double shell tunnel construction Eisenbahningenieur, 2000, 51 (12): : 49 - 55
- [6] Slab track on the Cologne-Rhine/Main line: The right decision Eisenbahningenieur, 2002, 53 (12): : 30 - 35
- [7] Schedule control on the new Cologne - Rhine/Main line using path-time diagrams Eisenbahningenieur, 2000, 51 (10): : 9 - 11
- [8] Stability analysis of tunnels of the new high speed railway line Cologne-Rhine/Main in Germany COMPUTER METHODS AND ADVANCES IN GEOMECHANICS, VOL 4, 1998, : 2479 - 2487
- [9] Contact line SICAT H1.0 for DB's new high-speed line Cologne-Rhine/Main ETG-Fachberichte (Energietechnische Gesellschaft im VDE), (74):
- [10] Online temperature monitoring of overhead contact line at the new German high-speed rail line Cologne-Rhine/Main COMPUTERS IN RAILWAY SIX, 2004, 15 : 875 - 882