Facilities, fabrication and installation

被引:0
|
作者
Anon
机构
来源
Hart's E and P | 2001年 / 74卷 / SUPPL.期
关键词
D O I
暂无
中图分类号
学科分类号
摘要
引用
收藏
相关论文
共 50 条
  • [1] Installation Shielding in Cyclotron Facilities
    Calandrino, Riccardo
    RADIATION PROTECTION IN MEDICAL PHYSICS, 2009, : 113 - 122
  • [2] The role of human and organisational factors (HOF) in the fabrication, installation and modification (FIM) phase of offshore facilities
    Gudmestad, OT
    Rettedal, WK
    Gordon, R
    Bellamy, L
    Stahl, B
    STRUCTURAL SAFETY AND RELIABILITY, VOLS. 1-3, 1998, : 2057 - 2065
  • [3] FABRICATION AND INSTALLATION OF ROBOT SYSTEMS
    OTTINGER, LV
    INDUSTRIAL ENGINEERING, 1982, 14 (05): : 92 - &
  • [4] FABRICATION, TESTING AND INSTALLATION OF BOLTS
    LACHAPELLE, L
    CIM BULLETIN, 1983, 76 (856): : 23 - 23
  • [5] HOW TO MANAGE INSTALLATION OF FIELD PRODUCTION FACILITIES
    ARNOLD, K
    STEWART, M
    WORLD OIL, 1983, 197 (07) : 71 - +
  • [6] Optimal over installation of wind generation facilities
    McInerney, Celine
    Bunn, Derek W.
    ENERGY ECONOMICS, 2017, 61 : 87 - 96
  • [7] MANUFACTURING ASPECTS OF OFFSHORE FABRICATION AND INSTALLATION
    Sjögren, P.
    Bellgran, M.
    Fagerström, B.
    Sandeberg, P.
    Transactions of the Royal Institution of Naval Architects Part A: International Journal of Maritime Engineering, 2014, 156 (3 A):
  • [8] Manufacturing aspects of offshore fabrication and installation
    Sjogren, P.
    Bellgran, M.
    Fagerstrom, B.
    Sandeberg, P.
    Transactions of the Royal Institution of Naval Architects Part A: International Journal of Maritime Engineering, 2014, 156 : 277 - 284
  • [9] MANUFACTURING ASPECTS OF OFFSHORE FABRICATION AND INSTALLATION
    Sjogren, P.
    Bellgran, M.
    Fagerstrom, B.
    Sandeberg, P.
    INTERNATIONAL JOURNAL OF MARITIME ENGINEERING, 2014, 156 : 277 - 284