Multi-resource constrained job-shop optimization scheduling based on ant colony algorithm

被引:0
|
作者
Liu, Zhi-Gang [1 ]
Li, Yan [1 ]
Li, Shu-Juan [1 ]
机构
[1] Mechanical and Precision Instrument Engineering, Xi'an University of Technology, Xi'an 710048, China
关键词
D O I
暂无
中图分类号
学科分类号
摘要
For multiple resource constrained job-shop scheduling problem(MRCJSP), Multiple resource constrained programming model was established which considered resources' type changing and restraint influence in resources' available time and an optimization scheduling approach was proposed based on ant colony algorithm. On the basis of the graphic definition of the job-shop problem, the rule of state-shift and pheromone update strategy and the working procedure time policy-making were designed and using the elitist strategy, the particular scheduling process was analyzed and realized. Simulation shows that ant colony algorithm performs well for MRCJSP.
引用
收藏
页码:216 / 220
相关论文
共 50 条
  • [1] IMPROVED ANT COLONY OPTIMIZATION FOR MULTI-RESOURCE JOB SHOP SCHEDULING: A SPECIAL CASE OF TRANSPORTATION
    Behmanesh, Reza
    Rahimi, Iman
    ECONOMIC COMPUTATION AND ECONOMIC CYBERNETICS STUDIES AND RESEARCH, 2021, 55 (04): : 277 - 294
  • [2] Research of Multi-resource Dynamic Job-Shop Scheduling based on the Hybrid Genetic Algorithm
    Zhao Peng
    Huang Ting-lei
    THIRD INTERNATIONAL CONFERENCE ON GENETIC AND EVOLUTIONARY COMPUTING, 2009, : 81 - 84
  • [3] Textile Flexible Job-Shop Scheduling Based on a Modified Ant Colony Optimization Algorithm
    Chen, Fengyu
    Xie, Wei
    Ma, Jiachen
    Chen, Jun
    Wang, Xiaoli
    APPLIED SCIENCES-BASEL, 2024, 14 (10):
  • [4] Multiple colony ant algorithm for job-shop scheduling problem
    Udomsakdigool, A.
    Kachitvichyanukul, V.
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2008, 46 (15) : 4155 - 4175
  • [5] MODELLING AND SIMULATION OF A MULTI-RESOURCE FLEXIBLE JOB-SHOP SCHEDULING
    Ba, L.
    Li, Y.
    Yang, M. S.
    Gao, X. Q.
    Liu, Y.
    INTERNATIONAL JOURNAL OF SIMULATION MODELLING, 2016, 15 (01) : 157 - 169
  • [6] Application of Ant Colony Algorithm to Job-Shop Scheduling Problem
    Cao, Yan
    Lei, Lei
    Fang, Yadong
    PRECISION ENGINEERING AND NON-TRADITIONAL MACHINING, 2012, 411 : 407 - 410
  • [7] Application of Ant Colony Algorithm in Discrete Job-shop Scheduling
    Sun, Bo
    Wang, Hui
    Fang, Yadong
    2009 SECOND INTERNATIONAL SYMPOSIUM ON KNOWLEDGE ACQUISITION AND MODELING: KAM 2009, VOL 2, 2009, : 29 - 32
  • [8] Ant Colony Optimization approach for Job-shop Scheduling Problem
    Zhang, Haipeng
    Gen, Mitsuo
    Fujimura, Shigeru
    Kim, Kwan Woo
    PROCEEDINGS OF THE THIRD INTERNATIONAL CONFERENCE ON INFORMATION AND MANAGEMENT SCIENCES, 2004, 3 : 426 - 431
  • [9] OPTIMIZATION ALGORITHM SIMULATION FOR DUAL-RESOURCE CONSTRAINED JOB-SHOP SCHEDULING
    Zhong, Q.
    Yang, H.
    Tang, T.
    INTERNATIONAL JOURNAL OF SIMULATION MODELLING, 2018, 17 (01) : 147 - 158
  • [10] Dynamic-Balance-Adaptive Ant Colony Optimization Algorithm for Job-Shop Scheduling
    Wang Wen-xia
    Wang Yan-hong
    Yu Hong-xia
    Zhang Cong-yi
    2013 FIFTH INTERNATIONAL CONFERENCE ON MEASURING TECHNOLOGY AND MECHATRONICS AUTOMATION (ICMTMA 2013), 2013, : 496 - 499