共 4 条
- [1] METHOD TO EVALUATE SERVICE BOUNDARY CONDITIONS FOR GAS TURBINE STATOR STRUCTURE BY USING INVERSE ANALYSIS PROCEEDINGS OF THE ASME TURBO EXPO 2011, VOL 6, PTS A AND B, 2012, : 63 - 68
- [2] Analysis on service life of hot-end components of gas turbine using equivalent operation Wang, T. (andywcczl@gmail.com), 1600, Universitas Ahmad Dahlan, Jalan Kapas 9, Semaki, Umbul Harjo,, Yogiakarta, 55165, Indonesia (11):
- [3] Medium- Btu fueled gas turbine combustor for use in IGCC (1st report, low NOx combustion method using nitrogen injection) Nippon Kikai Gakkai Ronbunshu, B Hen/Transactions of the Japan Society of Mechanical Engineers, Part B, 2003, 69 (682): : 1548 - 1556
- [4] Improvement of the inverse analysis approaches for assessment of welding deformations and residual stresses by using thermo elasto-plastic welding simulation (1st report, stress analysis for the bead flush method) Nihon Kikai Gakkai Ronbunshu, A Hen/Transactions of the Japan Society of Mechanical Engineers, Part A, 2010, 76 (767): : 884 - 892