The potential for reduction of landfill waste by recycling and mining of construction and demolition waste at the White Street Landfill, Greensboro, North Carolina

被引:0
|
作者
Chang, Shoou-Yuh [1 ]
Cramer, Rebecca [1 ]
机构
[1] Dept. of Civil and Environ. Eng., North Carolina A and T University, 1601 East Market Street, Greensboro, NC 27411, United States
来源
关键词
Construction - Debris - Demolition - Fly ash - Land fill - Land reclamation - Recycling;
D O I
暂无
中图分类号
学科分类号
摘要
Throughout the United States, many communities are faced with landfills that are reaching capacity. Due to stricter regulations and public awareness, simply opening new landfills is not always an option. Extending the life of a present landfill with a number of waste diversion initiatives including recycling as the key has become paramount. One type of waste that is currently of interest for potential recycling is Construction and Demolition (C&D) waste. In 1998, at the White Street Landfill, Greensboro, North Carolina, a section known as Phase II was dedicated to the disposal of C&D waste. This study explores the ability to extend the life of Phase II by a combination of mining the existing C&D waste, and recycling new C&D waste entering the landfill. The City of Greensboro Construction/Demolition Permit Application originally indicated a total available volume of 612,195 cubic yards (yd3) for C&D waste material in Phase II. Using this volume, it was originally predicted that Phase II would reach capacity in approximately 9.5 years. The increase in C&D waste in 1999 due to the closing of other C&D waste landfills in the area has significantly changed the life of Phase II. A recalculation of the Phase II life with the increased volume and potential growth based on the expected increase in population establishes the Phase II closing date at the beginning of 2002. With the assumption that 59.5% of the incoming C&D waste volume is recyclable, the closing of Phase II could be extended to the end of 2005 or the beginning of 2006. This will add approximately 4 years to the life of Phase II, and will generate an additional $1.5 million in revenue. This revenue should be sufficient to fund the cost of establishing an on-site C&D waste-recycling center.
引用
收藏
页码:42 / 55
相关论文
共 42 条
  • [1] Slender waste: reducing the girth of construction and demolition waste to landfill in Alice Springs
    Mathur, Deepika
    LIVING AND LEARNING: RESEARCH FOR A BETTER BUILT ENVIRONMENT, 2015, : 706 - 715
  • [2] Urban construction and demolition waste and landfill failure in Shenzhen, China
    Yang, Hong
    Xia, Junqiang
    Thompson, Julian R.
    Flower, Roger J.
    WASTE MANAGEMENT, 2017, 63 : 393 - 396
  • [3] Landfill Levy Imposition on Construction and Demolition Waste: Australian Stakeholders' Perceptions
    Shooshtarian, Salman
    Maqsood, Tayyab
    Khalfan, Malik
    Yang, Rebecca J.
    Wong, Peter
    SUSTAINABILITY, 2020, 12 (11)
  • [4] Construction, renovation, and demolition waste in landfill: a review of waste characteristics, environmental impacts, and mitigation measures
    Chen, Zhikun
    Feng, Qi
    Yue, Rengyu
    Chen, Zhi
    Moselhi, Osama
    Soliman, Ahmed
    Hammad, Amin
    An, Chunjiang
    ENVIRONMENTAL SCIENCE AND POLLUTION RESEARCH, 2022, 29 (31) : 46509 - 46526
  • [5] Spatial differentiation of carbon emissions reduction potential for construction and demolition waste recycling
    Wang Z.
    Qin F.
    Liu J.
    Xia B.
    Chileshe N.
    Environmental Science and Pollution Research, 2023, 30 (58) : 122304 - 122321
  • [6] Recycling Potential from Construction and Demolition Waste Management
    Agbenyeku, Emmanuel Emem-Obong
    Muzenda, Edison
    Msibi, Innocent Mandla
    Mbohwa, Charles
    WORLD CONGRESS ON ENGINEERING AND COMPUTER SCIENCE, WCECS 2017, VOL II, 2017, : 627 - 632
  • [7] Correction to: Construction, renovation, and demolition waste in landfill: a review of waste characteristics, environmental impacts, and mitigation measures
    Zhikun Chen
    Qi Feng
    Rengyu Yue
    Zhi Chen
    Osama Moselhi
    Ahmed Soliman
    Amin Hammad
    Chunjiang An
    Environmental Science and Pollution Research, 2024, 31 (47) : 58198 - 58198
  • [8] A study on the waste generation rates and recycling potential for the construction and demolition waste in Dhaka, Bangladesh
    Haque, Shama E.
    Nahar, Nazmun
    Haque, Md. Sazzadul
    ENVIRONMENTAL MONITORING AND ASSESSMENT, 2024, 196 (02)
  • [9] A study on the waste generation rates and recycling potential for the construction and demolition waste in Dhaka, Bangladesh
    Shama E. Haque
    Nazmun Nahar
    Md. Sazzadul Haque
    Environmental Monitoring and Assessment, 2024, 196
  • [10] CELL 87-Landfill Mining as alternative way for waste reduction
    Velazquez, Sarah Marie
    Ortiz, Nichole
    Rivera, Norman Omar
    Felix, Omayra Enid
    ABSTRACTS OF PAPERS OF THE AMERICAN CHEMICAL SOCIETY, 2008, 235