共 21 条
- [1] Zhu L., Li Q., Zhang J., Huang M., Difficulties and countermeasures of horizontal well cementing technology in Chuanxi Shaximiao Formation, Drilling & Production Technology, 37, 1, pp. 18-20, (2014)
- [2] Cavanagh P.H., Johnson C.R., Roy-Delage S.L., DeBruijn G.G., Cooper L., Guillot D.J., Et al., Self-healing cement-novel technology to achieve leak-free wells, SPE/IADC Drilling Conference
- [3] Bouras H., Doumaz H., Bellabarba M., Caceres E., Mananga S., Roy-Delage S.L., Et al., Responsive cementing material prevents annular leaks in gas wells, SPE Annual Technical Conference and Exhibition
- [4] Liu C., Zhang Y., Xie Y., Study on applying cement slurry consistency resistance change to forecast annular space gas channeling, Natural Gas Industry, 19, 5, pp. 46-50, (1999)
- [5] Li J., Gao B., Gong N., Xie Z., Chen Y., Han Y., A new fuzzy mathematics-based method for anti-channeling performance evaluation and its application, Drilling Fluid & Completion Fluid, 34, 4, pp. 69-74, (2017)
- [6] Li L., Peng J., Zhang B., Zeng N., Liu Y., A method determining the safety range of the annulus pressure for a high-pressure gas well and its application, Natural Gas Industry, 33, 1, pp. 101-104, (2013)
- [7] Fan M., Li J., Liu G., Chen X., Study on casing damage mechanism in volume fracturing of shale gas horizontal well, China Petroleum Machinery, 46, 4, pp. 82-87, (2018)
- [8] Gao D., Liu K., Progresses in shale gas well integrity research, Oil & Gas Geology, 40, 3, pp. 602-615, (2019)
- [9] Chao G., Chen Y., Research on the mechanism of annular gas channeling and slurry gas channeling control technology measures, Cement Engineering, 39, 4, pp. 79-81, (2006)
- [10] Bol G., Grant H., Keller S., Marcassa F., Rozieres J.D., Putting a stop to gas channeling, Oilfield Review, 3, 2, pp. 35-43, (1991)