Intelligent construction methods for the Baihetan super high arch dam

被引:0
|
作者
Tan Y. [1 ,2 ]
Fan Q. [2 ]
Wang Z. [1 ,2 ]
Chen W. [1 ,2 ]
Guo Z. [1 ,2 ]
Lin E. [2 ]
Lin P. [3 ]
Zhou T. [1 ,2 ]
Zhou M. [1 ,2 ]
Liu C. [1 ,2 ]
Gong P. [1 ,2 ]
Pei L. [1 ,2 ]
机构
[1] China Three Gorges Projects Development Co., Ltd., Chengdu
[2] China Three Gorges Group Corporation, Beijing
[3] Department of Hydralic Engineering, Tsinghua University, Beijing
关键词
Baihetan Hydropower Project; Hydraulic and hydropower engineering; Intelligent construction; Super-high arch dam;
D O I
10.16511/j.cnki.qhdxxb.2021.26.005
中图分类号
学科分类号
摘要
Construction projects are making use of modern information technology methods such as big data and artificial intelligence to improve project construction. The Xiluodu Hydropower Project is a pioneer application of intelligent construction methods for high arch dams. However, the rapid advances in information, sensing and data processing methods require further development of intelligent dam construction methods. Intelligent dam construction methods are introduced here as applied to the Baihetan Hydropower Project, a 300-meter ultra-high arch dam, with extensive monitoring measurements, real analyses, intelligent decision making and feedback control. This paper describes the intelligent construction system and its implementation with a focus on key construction processes and business processes including whole-process concrete placement monitoring, concrete leveling and vibrating monitoring, intelligent water-cooling, intelligent spraying and intelligent grouting. This paper then further describes the close-loop control of these intelligent methods and their functions. © 2021, Tsinghua University Press. All right reserved.
引用
收藏
页码:694 / 704
页数:10
相关论文
共 16 条
  • [1] ZHONG D H, WANG F, WU B P, Et al., From digital dam toward smart dam, Journal of Hydroelectric Engineering, 34, 10, pp. 1-13, (2015)
  • [2] ZHONG D H, SHI M N, CUI B, Et al., Research progress of the intelligent construction of dams, Journal of Hydraulic Engineering, 50, 1, pp. 38-52, (2019)
  • [3] ZHONG D H, CHANG H T, LIU N, Et al., Simulation and optimization of high rock-filled dam construction operations, Journal of Hydraulic Engineering, 44, 7, pp. 863-872, (2013)
  • [4] MA H Q, ZHONG D H, ZHAGN Z L, Et al., Key technologies of real-time construction control for major hydraulic and hydroelectric projects, Engineering Science, 13, 12, pp. 20-27, (2011)
  • [5] ZHONG D H, ZHAO C S, ZHANG P., Theory and application of construction simulation for roller compaction of high core rock-fill dam, Engineering Science, 13, 12, pp. 28-32, (2011)
  • [6] FAN Q X, HONG W H, WANG Z L, Et al., Innovation and application of construction management strategy for Xiluodu superhigh arch dam, Journal of Hydroelectric Engineering, 31, 6, pp. 288-293, (2012)
  • [7] LI Q B, LIN P, HU Y., Innovation and application of scientific research strategy to super-high arch dam, Journal of Hydroelectric Engineering, 32, 5, pp. 281-287, (2013)
  • [8] FAN Q X, LIN P, WEI P C, Et al., Closed-loop control theory of intelligent construction, Journal of Tsinghua University (Science and Technology), 61, 7, pp. 660-670, (2021)
  • [9] ZHAO Y M., Application and development of intelligent construction based on BIM in railway industry, Railway Computer Application, 28, 6, pp. 1-6, (2019)
  • [10] FAN Q X, ZHANG C R, CHEN W B, Et al., Key technologies of intelligent construction of Wudongde and Baihetan super high arch dams, Journal of Hydroelectric Engineering, 38, 2, pp. 22-35, (2019)