Comparison of the X¯ chart and the t chart when the parameters are estimated

被引:0
|
作者
机构
[1] Castagliola, Philippe
[2] Celano, Giovanni
[3] Fichera, Sergio
关键词
Flowcharting - Parameter estimation - Statistics - Statistical process control;
D O I
10.1080/16843703.2013.11673305
中图分类号
学科分类号
摘要
The estimation of the process parameters is an important issue to be fixed before starting a control chart implementation in a manufacturing process: in fact, correctly estimating the in-control mean and standard deviation of the quality parameter to be monitored can prevent from an unwanted deterioriation of the statistical performance of the control chart. Usually, the distribution parameters estimation is performed during the Phase I implementation of the control chart and is based on a finite number m of preliminary samples, each having size n, which is as large as the manufacturing environment can afford. This paper presents a comparison between the statistical properties of the Shewhart X¯ chart and the Shewhart t chart when the process parameters are estimated from a Phase I data set having finite size. Mathematical expressions for the ARL and SDRL are suggested for both the charts. Tables of the design parameters selected for the two charts are provided for different numbers of Phase I samples m and sample sizes n. A comparison between the statistical performances of the two charts with estimated parameters is discussed for process instability conditions shifting the process mean and/or standard deviation during the Phase II implementation of the chart. © ICAQM 2013.
引用
收藏
相关论文
共 50 条
  • [1] Comparison of the (X)over-bar Chart and the t Chart When the Parameters are Estimated
    Castagliola, Philippe
    Celano, Giovanni
    Fichera, Sergio
    [J]. QUALITY TECHNOLOGY AND QUANTITATIVE MANAGEMENT, 2013, 10 (01): : 1 - 16
  • [2] Properties of the T2 control chart when parameters are estimated
    Champ, CW
    Jones-Farmer, LA
    Rigdon, SE
    [J]. TECHNOMETRICS, 2005, 47 (04) : 437 - 445
  • [3] The Performance of the MEWMA Control Chart when Parameters are Estimated
    Mahmoud, M. A.
    Maravelakis, P. E.
    [J]. COMMUNICATIONS IN STATISTICS-SIMULATION AND COMPUTATION, 2010, 39 (09) : 1803 - 1817
  • [4] The variable sampling interval X chart with estimated parameters
    Zhang, Ying
    Castagliola, Philippe
    Wu, Zhang
    Khoo, Michael B. C.
    [J]. QUALITY AND RELIABILITY ENGINEERING INTERNATIONAL, 2012, 28 (01) : 19 - 34
  • [5] The median chart with estimated parameters
    Castagliola, Philippe
    Figueiredo, Fernanda Otilia
    [J]. EUROPEAN JOURNAL OF INDUSTRIAL ENGINEERING, 2013, 7 (05) : 594 - 614
  • [6] On the T2 control chart with estimated parameters
    Chen, Jiaqi
    Yang, Hualong
    Yao, Jianfeng
    [J]. QUALITY TECHNOLOGY AND QUANTITATIVE MANAGEMENT, 2018, 15 (06): : 716 - 729
  • [7] A CUSUM control chart for monitoring the variance when parameters are estimated
    Castagliola, Philippe
    Maravelakis, Petros E.
    [J]. JOURNAL OF STATISTICAL PLANNING AND INFERENCE, 2011, 141 (04) : 1463 - 1478
  • [8] OPTIMAL DESIGNS OF THE VARIABLE PARAMETERS X ESTIMATED PROCESS PARAMETERS CHART WITH
    Yahaya, Masthura Binti
    Li Lim, Sok
    Ibrahim, Adriana Irawati Nur binti
    Yeong, Wai Chung
    Khaw, Khai Wah
    [J]. INTERNATIONAL JOURNAL OF INDUSTRIAL ENGINEERING-THEORY APPLICATIONS AND PRACTICE, 2021, 28 (03): : 277 - 297
  • [9] The synthetic (X)over-bar chart with estimated parameters
    Zhang, Ying
    Castagliola, Philippe
    Wu, Zhang
    Khoo, Michael B. C.
    [J]. IIE TRANSACTIONS, 2011, 43 (09) : 676 - 687
  • [10] An EWMA chart for monitoring the process standard deviation when parameters are estimated
    Maravelakis, Petros E.
    Catagliola, Philippe
    [J]. COMPUTATIONAL STATISTICS & DATA ANALYSIS, 2009, 53 (07) : 2653 - 2664