Multi-machine scheduling problem with setup times

被引:0
|
作者
Bozejko, Wojciech [1 ]
Uchronski, Mariusz [2 ]
Wodecki, Mieczyslaw [3 ]
机构
[1] Institute of Computer Engineering, Control and Robotics, Wroclaw University of Technology, Janiszewskiego 11-17, 50-372 Wroclaw, Poland
[2] Centre of Networking and Supercomputing, Wyb. Wyspánskiego 27, 50-370 Wroclaw, Poland
[3] Institute of Computer Science, University of Wroclaw, Joliot-Curie 15, 50-383 Wroclaw, Poland
关键词
Tabu search;
D O I
10.2478/v10170-011-0034-y
中图分类号
学科分类号
摘要
引用
收藏
页码:441 / 449
相关论文
共 50 条
  • [1] Multi-machine Scheduling with Setup Times
    Bozejko, Wojciech
    Kacprzak, Lukasz
    Nadybski, Piotr
    Wodecki, Mieczyslaw
    COMPUTER INFORMATION SYSTEMS AND INDUSTRIAL MANAGEMENT, CISIM 2016, 2016, 9842 : 300 - 311
  • [2] Multi-purpose machine scheduling problem with bicriteria and setup times
    Jing, Cai-Xia
    Qian, Xing-San
    Tang, Guo-Chun
    Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS, 2010, 16 (04): : 867 - 872
  • [3] Single machine scheduling problem with family setup times
    Liu, Zheng-Gang
    Wang, Dao-Ping
    Jin, Feng
    Beijing Keji Daxue Xuebao/Journal of University of Science and Technology Beijing, 2009, 31 (10): : 1347 - 1350
  • [4] A single-machine bicriterion scheduling problem with setup times
    Lee, Wen-Chiung
    Wu, Chin-Chia
    JOURNAL OF STATISTICS & MANAGEMENT SYSTEMS, 2005, 8 (03): : 559 - 568
  • [5] Heuristics for the unrelated parallel machine scheduling problem with setup times
    Rabadi, G
    Moraga, RJ
    Al-Salem, A
    JOURNAL OF INTELLIGENT MANUFACTURING, 2006, 17 (01) : 85 - 97
  • [6] Heuristics for the Unrelated Parallel Machine Scheduling Problem with Setup Times
    Ghaith Rabadi
    Reinaldo J. Moraga
    Ameer Al-Salem
    Journal of Intelligent Manufacturing, 2006, 17 : 85 - 97
  • [7] Genetic Algorithm for single machine scheduling problem with setup times
    OuYang, Quan
    Xu, HongYun
    FRONTIERS OF MECHANICAL ENGINEERING AND MATERIALS ENGINEERING II, PTS 1 AND 2, 2014, 457-458 : 1678 - 1681
  • [8] Dynamic multi-machine lotsizing and sequencing with simultaneous scheduling of a common setup resource
    Tempelmeier, Horst
    Buschkuehl, Lisbeth
    INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2008, 113 (01) : 401 - 412
  • [9] Multi-machine scheduling problem with multi-time windows: Model and algorithm
    Liu, Wei
    Meng, Xin
    Zheng, Jianhua
    Beijing Hangkong Hangtian Daxue Xuebao/Journal of Beijing University of Aeronautics and Astronautics, 2009, 35 (03): : 330 - 333
  • [10] Multi-operation multi-machine scheduling
    Mao, WZ
    HIGH-PERFORMANCE COMPUTING AND NETWORKING, 1995, 919 : 33 - 38