共 50 条
- [1] Study on fully mechanized coal mining technology in passed 40 years in Datong mining area Meitan Xuebao/Journal of the China Coal Society, 2010, 35 (11): : 1772 - 1777
- [2] Study on technology of fully-mechanized sub-level caving mining technology in the datong permo carboniferous coal seam SUSTAINABLE DEVELOPMENT OF NATURAL RESOURCES, PTS 1-3, 2013, 616-618 : 565 - +
- [3] Roadway Supporting Technology in Fully Mechanized Workface with Large Mining Height of Specially Thick Coal Seam in Datong Mining Area PROGRESS IN INDUSTRIAL AND CIVIL ENGINEERING, PTS. 1-5, 2012, 204-208 : 1611 - 1616
- [4] Controlling the roof by grouting collapsing zone after coal mining Liaoning Gongcheng Jishu Daxue Xuebao (Ziran Kexue Ban)/Journal of Liaoning Technical University (Natural Science Edition), 2007, 26 (SUPPL. 1): : 15 - 16
- [5] Classification and movement characteristics of overlying strata structure of coal seams group mining in Datong mining area Caikuang yu Anquan Gongcheng Xuebao/Journal of Mining and Safety Engineering, 2023, 40 (05): : 972 - 982
- [6] Risk assessment of roof water inrush in No. 8 coal seam of Jurassic system Yan'an Formation in the first mining area of Xinzhuang Coal Mine in Ningzheng Mining Area Meitan Kexue Jishu/Coal Science and Technology (Peking), 2023, 51 : 298 - 309
- [8] Research and application of roadway backfill coal mining technology in western coal mining area Arabian Journal of Geosciences, 2016, 9
- [10] Mechanism of rockburst in stopes with typical thick roof and wide coal pillars in Ordos mining area Caikuang yu Anquan Gongcheng Xuebao/Journal of Mining and Safety Engineering, 2021, 38 (04): : 720 - 729