Design of Double-Steel-Truss Girder for Six-Track Railway Cable-Stayed Bridge with Two Decks

被引:0
|
作者
Liu, Yan [1 ]
Du, Ping [1 ]
Xu, Wei [1 ]
机构
[1] China Railway Major Bridge Reconnaissance & Design Institute Co., Ltd., Wuhan,430056, China
来源
Bridge Construction | 2020年 / 50卷
关键词
D O I
暂无
中图分类号
学科分类号
摘要
引用
收藏
页码:75 / 81
相关论文
共 50 条
  • [31] Application of Prestressed Concrete Box Girder Stiffed by Steel Truss in Cable-stayed Bridges of High-speed Railway
    Kang, Wei
    Journal of Railway Engineering Society, 2020, 37 (10) : 71 - 77
  • [32] Temperature mode of steel box girder of long span cable-stayed bridge of high-speed railway
    Liu W.
    Lü F.
    Dai G.
    Chang X.
    Xia D.
    Journal of Railway Science and Engineering, 2023, 20 (11) : 4031 - 4040
  • [33] Finite element analysis of steel and concrete joint section of railway hybrid box girder cable-stayed bridge
    Yao, Ya-Dong
    Yang, Yong-Qing
    Liu, Zhen-Biao
    Pu, Qian-Hui
    Shi, Zhou
    Bridge Construction, 2015, 45 (01) : 45 - 50
  • [34] INFLUENCE OF LONGITUDINAL ELASTIC CONSTRAINTS ON SEISMIC RESPONSE OF LARGE-SPAN STEEL TRUSS GIRDER CABLE-STAYED BRIDGE
    Liu, Qiyang
    Lei, Junqing
    Cao, Shanshan
    CONSTRUCTION AND MAINTENANCE OF RAILWAY INFRASTRUCTURE IN COMPLEX ENVIRONMENT, 2014, : 635 - 638
  • [35] Causes and Retrofits of Fatigue Cracking in the Braced Truss of Steel Box-Girder Longitudinal Diaphragms on a Cable-Stayed Bridge
    Li, Xincheng
    Fu, Zhongqiu
    Zhang, Haoming
    Wang, Zan
    Ji, Bohai
    JOURNAL OF PERFORMANCE OF CONSTRUCTED FACILITIES, 2024, 38 (02)
  • [36] Research on the Train-Bridge Coupled Vibration and Dynamic Performance of Steel Box Hybrid Girder Cable-Stayed Railway Bridge
    Yao, Yadong
    Xu, Baishun
    Wang, Yan
    TEHNICKI VJESNIK-TECHNICAL GAZETTE, 2020, 27 (02): : 656 - 664
  • [37] Study on the mechanical characteristics of steel truss cable-stayed bridge with water pipeline
    Li, Ranran
    Wang, Xiaoshan
    Zhang, Yajun
    Xue, Yuxin
    6TH INTERNATIONAL CONFERENCE ON ADVANCES IN ENERGY RESOURCES AND ENVIRONMENT ENGINEERING, 2021, 647
  • [38] The third bridge across the Orinoco River/Venezuela - A double-deck bridge cable-stayed bridge for highway and railroad with composite truss girder
    Saul, Reiner
    Humpf, Karl
    Schiele, Ingo
    STAHLBAU, 2010, 79 (02) : 63 - 76
  • [39] Construction control of long span steel box girder cable-stayed bridge
    Yue, Qing
    Yan, He-Zhong
    Que, Shui-Jie
    Liu, Hua
    Qin, Zhao-Fu
    Bridge Construction, 2013, 43 (04) : 54 - 60
  • [40] Construction monitoring and control of steel truss girder cable-stayed bridge of Huanggang Changjiang River Rail-cum-Road bridge
    Li, Wei-Hua
    Yang, Guang-Wu
    Yue, Qing
    Wu, Guo-Qiang
    Bridge Construction, 2013, 43 (03) : 11 - 17