Dynamic visual simulation of diversion tunnel construction based on CATIA

被引:0
|
作者
Wang X. [1 ]
Ou L. [1 ]
Ren B. [1 ]
Zhao M. [1 ]
Xiao Y. [1 ]
Liu Z. [1 ]
机构
[1] State Key Laboratory of Hydraulic Engineering Simulation and Safety, Tianjin University, Tianjin
来源
| 2018年 / International Research and Training Center on Erosion and Sedimentation and China Water and Power Press卷 / 49期
关键词
4D model; CATIA; Diversion tunnel; Dynamic construction simulation; Parametric design;
D O I
10.13243/j.cnki.slxb.20170646
中图分类号
学科分类号
摘要
Present studies usually use animation to realize dynamic visual simulation of tunnel construction, which makes 3D models difficult to modify, makes visual simulation process complex to realize and lacks of interaction. Therefore, this paper proposes a dynamic visual simulation method of diversion tunnel construction based on CATIA. Firstly, a 4D simulation model of diversion tunnel was built using parametric design. This 4D model can not only be modified easily and realize construction dynamic visual interactive simulation, but also can modify the visual simulation results easily. Secondly, the construction information could be inquired with secondary development. Finally, this method was applied to an engineering project. It shows that the efficiency of dynamic visual simulation of diversion tunnel construction is improved and helps project managers to make decision when scheme changes. © 2018, China Water Power Press. All right reserved.
引用
收藏
页码:369 / 378
页数:9
相关论文
共 7 条
  • [1] Wang W.C., Weng S.W., Wang S.H., Et al., Integrating building information models with construction pro-cess simulations for project scheduling support, Automation in Construction, 37, 6, pp. 68-80, (2014)
  • [2] Mawlana M., Vahdatikhaki F., Doriani A., Et al., Integrating 4D modeling and discrete event simulation for phasing evaluation of elevated urban highway reconstruction projects, Automation in Construction, 60, pp. 25-38, (2015)
  • [3] Zanen P.P.A., Hartmann T., Al-Jibouri S.H.S., Et al., Using 4D CAD to visualize the impacts of highway construction on the public, Automation in Construction, 32, 8, pp. 136-144, (2013)
  • [4] Lee G., Sacks R., Eastman C.M., Specifying parametric building object behavior(BOB)for a building infor-mation modeling system, Automation in Construction, 15, 6, pp. 758-776, (2006)
  • [5] Chu C.H., Song M.C., Luo V.C.S., Computer aided parametric design for 3D tire mold production, Computers in Industry, 57, 1, pp. 11-25, (2006)
  • [6] Zhong D.H., Bi L., Yu J., Et al., Robustness analysis of underground powerhouse construction simulation based on Markov Chain Monte Carlo method, SCIENCE CHINA(Technological Sciences), 59, 2, pp. 252-264, (2016)
  • [7] Lei B., Ren B., Zhong D., Et al., Real-time construction schedule analysis of long-distance diversion tunnels based on lithological predictions using a markov process, Journal of Construction Engineering & Management, 141, 2, (2015)