共 7 条
- [1] Wang W.C., Weng S.W., Wang S.H., Et al., Integrating building information models with construction pro-cess simulations for project scheduling support, Automation in Construction, 37, 6, pp. 68-80, (2014)
- [2] Mawlana M., Vahdatikhaki F., Doriani A., Et al., Integrating 4D modeling and discrete event simulation for phasing evaluation of elevated urban highway reconstruction projects, Automation in Construction, 60, pp. 25-38, (2015)
- [3] Zanen P.P.A., Hartmann T., Al-Jibouri S.H.S., Et al., Using 4D CAD to visualize the impacts of highway construction on the public, Automation in Construction, 32, 8, pp. 136-144, (2013)
- [4] Lee G., Sacks R., Eastman C.M., Specifying parametric building object behavior(BOB)for a building infor-mation modeling system, Automation in Construction, 15, 6, pp. 758-776, (2006)
- [5] Chu C.H., Song M.C., Luo V.C.S., Computer aided parametric design for 3D tire mold production, Computers in Industry, 57, 1, pp. 11-25, (2006)
- [6] Zhong D.H., Bi L., Yu J., Et al., Robustness analysis of underground powerhouse construction simulation based on Markov Chain Monte Carlo method, SCIENCE CHINA(Technological Sciences), 59, 2, pp. 252-264, (2016)
- [7] Lei B., Ren B., Zhong D., Et al., Real-time construction schedule analysis of long-distance diversion tunnels based on lithological predictions using a markov process, Journal of Construction Engineering & Management, 141, 2, (2015)