Research on paste back filling mining technology of coal mining under buildings, water bodies and railways

被引:0
|
作者
Sun X. [1 ]
机构
[1] Shandong Energy Group Co., Ltd., Jinan
关键词
Coal mining under buildings; Coal pillar replacement; Floor confined water; Jinbei Mining Area; Paste back filling; Railways; Water bodies;
D O I
10.13199/j.cnki.cst.2021.01.017
中图分类号
学科分类号
摘要
Paste back filling is one of the main back filling mining techniques to control overburden moment and prevent surface subsidence. In view of the mining problems of compressed coal resources under buildings, water bodies, railways and confined water bodies in the process of coal mining in eastern China, based on the mining conditions of the main mines in Jibei Mining Area of Zibo Mining Group, this paper analyzes the basic principles, process methods and applications of paste back filling, especially focusing on the analysis of strip coal pillar replacement mining, coal mining under high buildings and coal filling above floor confined water in Daizhuang Coal Mine. By applying the paste back filling mining technology, the ground deformation values are less than I damage standard. Damage depth of working face under the threat of floor limestone water was just from 6.0 to 6.5 m after paste back filling mining witch has significant effect to prevent floor water disasters. According to the future development direction of the Jibei Mining Area, research directions on paste back filling mining were proposed, such as theory and technology above floor confined water, protection of buildings under the influence of repeated mining, optimization of filling process, equipment and flow under complex conditions, combination between underground coal - gangue intelligent separation system and paste back filling mining. The research results will provide important reference for deepening application of paste back filling mining in the Jibei Mining Area. © 2021 The authors.
引用
收藏
页码:218 / 224
页数:6
相关论文
共 15 条
  • [1] QIAN Minggao, XL Jialin, M1AO Xiexing, Green technique in coal mining[J], Journal of China Lniversity of Mining & Technology, 32, 4, pp. 343-348, (2003)
  • [2] ZHOL Huaqiang, HOL Chaojiong, SLN Xikui, Et al., Solid waste paste back filling for none-village-relocation coal mining[J], Journal of China L niversity of Mining & Technology, 3 3, 2, pp. 154-158, (2004)
  • [3] EENG Guangming, SLN Chundong, ANG Chengzhen W, Et al., Research on goaf filling methods with super high - water material [J], Journal of China Coal Society, 35, 12, pp. 1963-1968, (2010)
  • [4] Xikui SLN, ANG Wei W, Theoretical research on high water material replacement mining the strip coal pillar above confined aquifer[J], Journal of China Coal Society, 36, 6, pp. 909-913, (2011)
  • [5] XL Jialin, ZHL Weibing, LI Xingshang, Et al., Study of the technology of partial-filling to control coal mining subsidence [J], Journal of Mining & Safety Engineering, 23, 1, pp. 6-11, (2006)
  • [6] Jialin XL, 1 Jianming N, AN Dayang XL, Et al., Coal mining technology without village relocation by isolated grout injection into overburden[J], Coal Science and Technology, 43, 12, pp. 8-11, (2015)
  • [7] Jialin XL, Dayang XL AN, Weibing ZLU, Et al., Study and application of coal mining with partial backfilling [J], Journal of China Coal Society, 40, 6, pp. 1303-1312, (2015)
  • [8] BKACKEBLSCH E W., Basics of paste backfill systems, Mining Engineering, 46, 10, pp. 1175-1178, (1994)
  • [9] YANG Qingming, JIANG Daopi, innovation in the design and construction of Jinbei mining area, Shandong Coal Technology, 4, pp. 8-9, (2000)
  • [10] YANG Xianjiang, practice of green mining technology for paste back filling in daizhuang coal mine [J], Shandong Coal Technology, 2 5, pp. 189-191, (2019)