共 50 条
- [3] Benefit Analysis of Wuhan-Guangzhou High-Speed Railway Train Operation Plan [J]. PROCEEDINGS OF THE SIXTH INTERNATIONAL CONFERENCE ON TRANSPORTATION ENGINEERING (ICTE 2019), 2019, : 625 - 631
- [6] The Transportation Organization Mode of Off-Line Train in Wuhan-Guangzhou High-Speed Railway [J]. PROCEEDINGS OF THE SIXTH INTERNATIONAL CONFERENCE ON TRANSPORTATION ENGINEERING (ICTE 2019), 2019, : 907 - 914
- [7] Power Spectral Analysis of Track Irregularity of Wuhan-Guangzhou High-Speed Track [J]. INNOVATION AND SUSTAINABILITY OF MODERN RAILWAY, 2012, : 99 - 103
- [9] Analysis of Urban Accessibility of High Speed Railway Based on DEA Index-Taking Wuhan-Guangzhou High Speed Railway as An Example [J]. PROCEEDINGS OF THE 2017 2ND INTERNATIONAL CONFERENCE ON MODERN MANAGEMENT, EDUCATION TECHNOLOGY, AND SOCIAL SCIENCE (MMETSS 2017), 2017, 146 : 45 - 52
- [10] Studies on the residual settlement of CFG pile composite foundation of the Wuhan-Guangzhou high speed railway [J]. SUSTAINABLE ENVIRONMENT AND TRANSPORTATION, PTS 1-4, 2012, 178-181 : 1590 - 1595