Algorithms for no-wait flowshops with total completion time subject to makespan

被引:0
|
作者
机构
[1] Allahverdi, Ali
[2] Aydilek, Harun
来源
Allahverdi, A. (ali.allahverdi@ku.edu.kw) | 1600年 / Springer London卷 / 68期
关键词
D O I
暂无
中图分类号
学科分类号
摘要
引用
收藏
页码:9 / 12
相关论文
共 50 条
  • [1] Algorithms for no-wait flowshops with total completion time subject to makespan
    Ali Allahverdi
    Harun Aydilek
    [J]. The International Journal of Advanced Manufacturing Technology, 2013, 68 : 2237 - 2251
  • [2] Algorithms for no-wait flowshops with total completion time subject to makespan
    Allahverdi, Ali
    Aydilek, Harun
    [J]. INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2013, 68 (9-12): : 2237 - 2251
  • [3] No-wait flowshops with bicriteria of makespan and total completion time
    Allahverdi, A
    Aldowaisan, T
    [J]. JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 2002, 53 (09) : 1004 - 1015
  • [4] Heuristics for no-wait flowshops with makespan subject to mean completion time
    Aydilek, Harun
    Allahverdi, Ali
    [J]. APPLIED MATHEMATICS AND COMPUTATION, 2012, 219 (01) : 351 - 359
  • [5] Total completion time with makespan constraint in no-wait flowshops with setup times
    Allahverdi, Ali
    Aydilek, Harun
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2014, 238 (03) : 724 - 734
  • [6] No-wait flowshops with bicriteria of makespan and maximum lateness
    Allahverdi, A
    Aldowaisan, T
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2004, 152 (01) : 132 - 147
  • [7] An iterated greedy algorithm for the no-wait flowshop scheduling problem to minimize makespan subject to total completion time
    Nagano, Marcelo Seido
    de Almeida, Fernando Siqueira
    Miyata, Hugo Hissashi
    [J]. ENGINEERING OPTIMIZATION, 2021, 53 (08) : 1431 - 1449
  • [8] New heuristics for no-wait flowshops to minimize makespan
    Aldowaisan, T
    Allahverdi, A
    [J]. COMPUTERS & OPERATIONS RESEARCH, 2003, 30 (08) : 1219 - 1231
  • [9] Total-idle-time increment based hybrid GA for no-wait flowshops with makespan minimization
    Zhu, Xia
    Li, Xiaoping
    Wang, Qian
    [J]. Jisuanji Yanjiu yu Fazhan/Computer Research and Development, 2011, 48 (03): : 455 - 463
  • [10] Some effective heuristics for no-wait flowshops with setup times to minimize total completion time
    Rubén Ruiz
    Ali Allahverdi
    [J]. Annals of Operations Research, 2007, 156 : 143 - 171