Onset of slugging of stagnant liquid at a V-shaped elbow in a pipeline

被引:0
|
作者
Irikura, Motoki [1 ]
Hosokawa, Shigeo [1 ]
Tomiyama, Akio [1 ]
机构
[1] Graduate School of Engineering, Kobe University, 1-1 Rokkodai, Nada-ku, Kobe-shi, Hyogo, 657-8501, Japan
关键词
Pipelines;
D O I
10.1299/kikaib.78.1292
中图分类号
学科分类号
摘要
引用
收藏
页码:1292 / 1301
相关论文
共 50 条
  • [1] Numerical simulation of slugging of stagnant liquid at a V-shaped elbow in a pipeline
    Irikura, Motoki
    Maekawa, Munenori
    Hosokawa, Shigeo
    Tomiyama, Akio
    APPLIED MATHEMATICAL MODELLING, 2014, 38 (17-18) : 4238 - 4248
  • [2] STABILITY OF GAS-FLOW OVER A STAGNANT LIQUID IN A PIPE AND ONSET OF SLUGGING
    FITREMANN, JM
    INTERNATIONAL JOURNAL OF MULTIPHASE FLOW, 1976, 3 (02) : 117 - 122
  • [3] On the V-shaped switching in antiferroelectric liquid crystals
    Panarin, Y
    Panov, V
    Kalinovskaya, OE
    Vij, JK
    FERROELECTRICS, 2000, 246 (1-4) : 941 - 948
  • [4] Synthesis of V-Shaped liquid crystal benzoates
    L. G. Derkach
    N. S. Novikova
    E. Górecka
    E. D. Kilimenchuk
    Russian Journal of General Chemistry, 2015, 85 : 1606 - 1610
  • [5] Synthesis of V-Shaped liquid crystal benzoates
    Derkach, L. G.
    Novikova, N. S.
    Gorecka, E.
    Kilimenchuk, E. D.
    RUSSIAN JOURNAL OF GENERAL CHEMISTRY, 2015, 85 (07) : 1606 - 1610
  • [6] V-shaped switching in ferroelectric liquid crystals
    Maclennan, JE
    Rudquist, P
    Shao, RF
    Link, DR
    Walba, DM
    Clark, NA
    Lagerwall, ST
    LIQUID CRYSTALS III, 1999, 3800 : 136 - 139
  • [7] Chiral V-shaped liquid-crystal molecules
    Carboni, C
    Straw, A
    Al-Nadhiri, R
    FERROELECTRICS, 2000, 246 (1-4) : 985 - 992
  • [8] Numerical Simulation of Slug Generation at a V-Shaped Elbow between Inclined Pipes
    Irikura, Motoki
    Maekawa, Munenori
    Hosokawa, Shigeo
    Tomiyama, Akio
    KAGAKU KOGAKU RONBUNSHU, 2014, 40 (04) : 275 - 281
  • [9] V-shaped flight
    Romagne, Thieny
    EUROPE-REVUE LITTERAIRE MENSUELLE, 2022, (1122) : 318 - 319
  • [10] OPTIMIZATION OF MAINTENANCE COSTS OF A PIPELINE FOR A V-SHAPED HAZARD RATE OF MALFUNCTION INTENSITIES
    Romaniuk, Maciej
    EKSPLOATACJA I NIEZAWODNOSC-MAINTENANCE AND RELIABILITY, 2018, 20 (01): : 46 - 56