Research on the scheduling algorithms of FMS

被引:0
|
作者
Niu, Hai-Jun [1 ]
Xu, Jia-Hui [1 ]
机构
[1] Res. Inst. of Comp. Peripheral, Xidian Univ., Xi'an 710071, China
关键词
D O I
暂无
中图分类号
学科分类号
摘要
5
引用
收藏
页码:35 / 38
相关论文
共 50 条
  • [1] The Research of FMS Scheduling and Simulation
    Bian, Peiying
    Bian, Peisong
    [J]. MACHINERY, MATERIALS SCIENCE AND ENGINEERING APPLICATIONS, 2012, 510 : 70 - +
  • [2] Research on Key Issues of Scheduling in FMS
    徐常胜
    [J]. High Technology Letters, 1995, (02) : 16 - 19
  • [3] Research on Modeling and Simulation of Scheduling with Tool Failure in FMS
    Zhao Dan
    Zhang Jia-tai
    Li Ling-li
    [J]. ADVANCED DESIGN AND MANUFACTURE II, 2010, 419-420 : 101 - +
  • [4] A FMS Dynamic Scheduling Optimization Strategy and Simulation Research
    Hui, Ji-Zhuang
    Guo, Yun-Xin
    Wu, Lin-lin
    [J]. PROCEEDINGS OF THE 3RD INTERNATIONAL CONFERENCE ON MATERIAL ENGINEERING AND APPLICATION (ICMEA 2016), 2016, 103 : 536 - 543
  • [5] Petri nets and ant colony optimization algorithms based scheduling for FMS
    Shao, ZF
    Qian, XS
    Ma, L
    [J]. PROCEEDINGS OF THE 2005 INTERNATIONAL CONFERENCE ON MANAGEMENT SCIENCE & ENGINEERING (12TH), VOLS 1- 3, 2005, : 638 - 643
  • [6] Research on QoS scheduling algorithms
    Li Xiao-lin
    Jiang Ying-hua
    Guo Ping
    Zhao Juan
    [J]. PROCEEDINGS OF THE INTERNATIONAL CONFERENCE INFORMATION COMPUTING AND AUTOMATION, VOLS 1-3, 2008, : 760 - +
  • [7] Research on algorithms of task scheduling
    Yang, DS
    Lu, YL
    Liu, Z
    Zhang, WM
    [J]. PROCEEDINGS OF THE 2004 INTERNATIONAL CONFERENCE ON MACHINE LEARNING AND CYBERNETICS, VOLS 1-7, 2004, : 42 - 47
  • [8] Extending an Agent-Based FMS Scheduling Approach with Parallel Genetic Algorithms
    Abaza, Ghada
    Badr, Iman
    Goehner, Peter
    Jeschke, Sabina
    [J]. IECON 2010 - 36TH ANNUAL CONFERENCE ON IEEE INDUSTRIAL ELECTRONICS SOCIETY, 2010,
  • [9] Solving distributed FMS scheduling problems subject to maintenance: Genetic algorithms approach
    Chan, Felix T. S.
    Chung, S. H.
    Chan, L. Y.
    Finke, G.
    Tiwari, M. K.
    [J]. ROBOTICS AND COMPUTER-INTEGRATED MANUFACTURING, 2006, 22 (5-6) : 493 - 504
  • [10] PLANNING AND SCHEDULING IN AN FMS
    AANEN, E
    GAALMAN, GJ
    NAWIJN, WM
    [J]. ENGINEERING COSTS AND PRODUCTION ECONOMICS, 1989, 17 (1-4): : 89 - 97