Methodology and procedures for the planning and construction of production plants in the ceramics industry, Part I

被引:0
|
作者
Zollfrank, Günter [1 ]
机构
[1] I.B.Z. Engineering, Hauptstraße 19, D-95100 Selb-Erkersreuth, Germany
关键词
Computer simulation - Industrial engineering - Mathematical models - Planning - Process engineering;
D O I
暂无
中图分类号
学科分类号
摘要
In the present article and the subsequent papers, the author will present an integrated procedure of plant design according to the chronological planning process. Particular attention is paid to the numeric modelling of the industrial process in conjunction with a possible computer simulation. Another focus will be placed on logistic systems as the main cost-saving potential of the decade. The author will attempt to meet the data requirements of fixed employed project engineers as well as freelance/self-employed consultants in industrial engineering.
引用
收藏
页码:4 / 7
相关论文
共 50 条
  • [1] A REVIEW OF PRODUCTION PLANNING AND SCHEDULING MODELS IN THE SEMICONDUCTOR INDUSTRY PART I: SYSTEM CHARACTERISTICS, PERFORMANCE EVALUATION AND PRODUCTION PLANNING
    UZSOY, R
    LEE, CY
    MARTINVEGA, LA
    [J]. IIE TRANSACTIONS, 1992, 24 (04) : 47 - 60
  • [2] The evolutionary development of the methodology of operational planning of construction production
    Slavin, Alexey
    Sinenko, Sergey
    Yoshin, Nikita
    [J]. XXI INTERNATIONAL SCIENTIFIC CONFERENCE ON ADVANCED IN CIVIL ENGINEERING CONSTRUCTION - THE FORMATION OF LIVING ENVIRONMENT (FORM 2018), 2018, 365
  • [3] Safety Aspects in Planning and Construction of Modular Production Plants
    Fleischer, Christoph
    Wittmann, Juri
    Kockmann, Norbert
    Bieringer, Thomas
    Bramsiepe, Christian
    [J]. CHEMIE INGENIEUR TECHNIK, 2015, 87 (09) : 1258 - 1269
  • [4] Slack in production planning and control: a study in the construction industry
    Fireman, Marcus C. T.
    Saurin, Tarcisio Abreu
    Formoso, Carlos Torres
    Koskela, Lauri
    Tommelein, Iris D.
    [J]. CONSTRUCTION MANAGEMENT AND ECONOMICS, 2023, 41 (03) : 256 - 276
  • [5] Networks in the construction industry: Emerging regulation procedures in the production process
    Benhaim, M
    Birchall, D
    [J]. PROFITABLE PARTNERING IN CONSTRUCTION PROCUREMENT, 1999, : 63 - 73
  • [6] Study of the Production of Synthetic Aggregate Made with Waste from the Bayer Process for the Construction Industry - Part I
    da Silva Souza, Jose Antonio
    Racanelli, Leda de Azevedo
    Nonato Quaresma, Joao Nazareno
    [J]. MATERIA-RIO DE JANEIRO, 2022, 27 (01):
  • [7] Work preparation - Construction production planning process (part 1)
    Girmscheid, G.
    [J]. BAUINGENIEUR, 2014, 89 : 431 - 444
  • [8] Transients in Wind Power Plants - Part I: Modeling Methodology and Validation
    Badrzadeh, Babak
    Hogdahl, Martin
    Isabegovic, Emir
    [J]. 2011 IEEE INDUSTRY APPLICATIONS SOCIETY ANNUAL MEETING (IAS), 2011,
  • [9] PREPARATION OF PLANNING COURSE MODELS FOR PROSPECTIVE AND ANNUAL PLANNING IN INDUSTRY FOOD PRODUCTION PLANTS
    SCHINDLE.H
    [J]. LEBENSMITTEL INDUSTRIE, 1970, 17 (03): : 108 - &
  • [10] SYNTHESIS OF OPERATING PROCEDURES FOR COMPLETE CHEMICAL-PLANTS .2. A NONLINEAR PLANNING METHODOLOGY
    LAKSHMANAN, R
    STEPHANOPOULOS, G
    [J]. COMPUTERS & CHEMICAL ENGINEERING, 1988, 12 (9-10) : 1003 - 1021