A new dry coke cooling process of delayed coking units and its parameter analysis

被引:0
|
作者
Cao L. [1 ]
Zhou Y.-H. [1 ]
Fan Z.-Y. [1 ]
Wang G.-H. [1 ]
Yan J.-B. [1 ]
Lei Y. [1 ]
机构
[1] School of Chemistry and Chemical Engineering, Key Laboratory of Hubei Province for Coal Conversion and New Carbon Materials, Wuhan University of Science and Technology, Wuhan
关键词
Aspen Plus; Delayed coking; Dry coke cooling; Economy;
D O I
10.3969/j.issn.1003-9015.2021.01.016
中图分类号
学科分类号
摘要
A new dry coke cooling process was proposed for the wet quenched coke process of delayed coking units. The process effectively avoided the generation of wastewater in the water supply during coke cooling processes, utilized coke heat and improved coke quality. Following the dry quenched process in coal coking, the flue gas generated in the fluid catalytic cracking process was introduced into the coke tower for coke cooling, and the heat absorbed flue gas was used as the secondary heat source. The heat was then released in the waste heat boiler. Therefore, the process of coke-cooling water replacement with flue gas was achieved. The dry coke cooling process was simulated by Aspen Plus, and the effects of main parameters on cooling results were studied and evaluated. The results show that the effects of the main parameters on total annual cost are: heat capacity of circulating flue gas > split ratio > outlet pressure of compressor > temperature of coke cooling > temperature of flue gas from fluid catalytic cracking units. When the outlet pressure of compressor is higher than 0.16 MPa and the split ratio is more than 0.12, the economy of the process are infeasible. © 2021, Editorial Board of "Journal of Chemical Engineering of Chinese Universities". All right reserved.
引用
收藏
页码:140 / 147
页数:7
相关论文
共 19 条
  • [1] CHEN Z Y, LI S M., Optimization measures for treatment process of odor from cold coke tank in delayed coking unit, Chemical Engineering and Equipment, 9, pp. 331-333, (2018)
  • [2] CHENG Y S, GUO B R., Energy-saving water cooling process of coke cooling, Petroleum Processing and Petrochemicals, 2, pp. 19-21, (1984)
  • [3] ZHAO L, LU F., Feasibility study of reusing refining wastewater as cooling water of coke, Petroleum Processing and Petrochemicals, 39, 8, pp. 67-70, (2008)
  • [4] ZHANG J S., Water replacing steam for coke cooling in delayed coker, Energy Conservation and Emission Reduction in Petroleum and Petrochemical Industry, 3, 3, pp. 12-15, (2013)
  • [5] ZHAO Y, WANG Z G, YI L, Et al., Application of water instead of steam in delayed coking unit, Petrochemical Technology and Application, 34, 5, pp. 403-405, (2016)
  • [6] YIN Z K, WEI W P, XU W., Intelligent spray process of large steam blowing process in coking device
  • [7] ZHAO H Z., Experimental and numerical simulation study on atomizer performance in coke cooling process of delayed coking, (2014)
  • [8] GUO S X, YUAN Z X, ZHONG X S, Et al., Cooling coke process and device of delayed coking coke tower
  • [9] SUN S L., Energy saving upgrading for large steaming out system in coke tower of delayed coking unit [J], Petrochemical Industry Technology, 23, 2, pp. 35-35, (2016)
  • [10] SUN K, TSENG C T, WONG S H, Et al., Model predictive control for improving waste heat recovery in coke dry quenching processes, Energy, 80, pp. 275-283, (2015)