Discussion on planning of transforming idle railway into urban railway in Tianjin terminal

被引:0
|
作者
The Third Railway Survey and Design Institute Group Corporation, Tianjin 300142, China [1 ]
机构
来源
J. Railw. Eng. Soc. | / 3卷 / 19-24期
关键词
Light rail transit - Mass transportation - Problem solving - Railroad transportation;
D O I
暂无
中图分类号
学科分类号
摘要
Research purposes: As the rapid expansion of the city scale, traffic problem has become a major contradiction. The most effective way of solving this problem is to develop the urban mass trasit. But the current problem is: on one hand, as the rapid construction of the railway, part of the railway resources lie idle, on the other hand, the construction of urban mass transit need a large number of funds and precious urban track resources. This paper analyzes how to make the idle railway give play to the urban transit function in Tianjin terminal, and hope to provide references for the diversification mode choice of the urban mass transit in other cities. Research conclusions: (1) Use the existing railway and the newly built railway to form a circuit urban railway which includes Tianjin Station- Tianjin North Station-Xiyingmen Station-Chentangzhuang Station-Tianjin Station. (2) Use the surplus transportation capacity of the Tianjin-Shanhaiguan line to run urban trains from downtown to Binhai New Area. (3) Use the abandoned railway and part of newly built railway to form the transit track from downtown to Jinghai and Dagang, and run urban trains. (4)Use the existing railway double line project to form the transit track from downtown to Baodi and Ji county, and run urban trains. (5)This result can provide the reference for other cities.
引用
收藏
相关论文
共 50 条
  • [1] Research on the integration of railway planning and urban planning
    Feng, Ye
    Fei, Cheng
    [J]. 2015 INTERNATIONAL CONFERENCE ON INTELLIGENT TRANSPORTATION, BIG DATA AND SMART CITY (ICITBS), 2016, : 669 - 672
  • [2] To construct urban light rail with the idle assets of railway hub
    Jinying, Y
    [J]. URBAN TRANSPORT VIII: URBAN TRANSPORT AND THE ENVIRONMENT IN THE 21ST CENTURY, 2002, 12 : 221 - 227
  • [3] Research on the Schemes of Leading Tianjin-Weifang Railway into Tianjin Railway Hub
    Yu, Hongfei
    Dong, Rukai
    [J]. Journal of Railway Engineering Society, 2022, 39 (06) : 11 - 17
  • [4] Discussion on Operational Risk and Financial Sustainability of Beijing-Tianjin High Speed Railway
    Kuang Xu-juan
    Li Hong-chang
    [J]. 2012 INTERNATIONAL CONFERENCE ON MANAGEMENT SCIENCE & ENGINEERING, 2012, : 1800 - 1805
  • [5] ON PLANNING RAILWAY INVESTMENT
    MILLS, G
    HOWE, M
    [J]. OXFORD BULLETIN OF ECONOMICS AND STATISTICS, 1962, 24 (01) : 51 - 59
  • [6] PLANNING RAILWAY CONSTRUCTION
    FAZIO, AE
    FAZIO, RN
    TRYON, EK
    [J]. JOURNAL OF TRANSPORTATION ENGINEERING, 1983, 109 (01) : 73 - 87
  • [7] Planning, construction and experimental tuning of an urban railway noise cadaster
    Presta, M
    Ricci, S
    [J]. URBAN TRANSPORT IX: URBAN TRANSPORT AND THE ENVIRONMENT IN THE 21ST CENTURY, 2003, 14 : 393 - 402
  • [8] RAILWAY COSTS AND PLANNING
    JOY, S
    [J]. JOURNAL OF TRANSPORT ECONOMICS AND POLICY, 1989, 23 (01) : 45 - 54
  • [9] PLANNING FOR RAILWAY ELECTRIFICATION
    CLEMOW, CJ
    [J]. PROCEEDINGS OF THE INSTITUTION OF ELECTRICAL ENGINEERS-LONDON, 1972, 119 (04): : 431 - &
  • [10] Settlement Monitoring of Passenger Railway Tianjin to Qinhuangdao
    He, Yuelei
    Shi, Rong
    [J]. ADVANCES IN STRUCTURES, PTS 1-5, 2011, 163-167 : 2637 - 2640