Dynamic evaluation of the top-down construction of the Belfiore high-speed railway station

被引:0
|
作者
Magursi L. [1 ]
Zurlo R. [1 ]
Sorbello R. [1 ]
机构
[1] Infrarail Firenze s.r.l., Via Circondaria 32–34, Firenze
来源
Geomechanik und Tunnelbau | 2022年 / 15卷 / 02期
关键词
BIM; 4D; Building Information Modeling (BIM) for infrastructure; clash detection; Construction works; Excavations; interference check; Mechanized tunneling; Railway tunnels; time analysis;
D O I
10.1002/geot.202100069
中图分类号
学科分类号
摘要
The construction phase of underground railway stations executed with top-down method is often susceptible to a considerable number of interferences. The interference between the excavation of the Florence high-speed station and tunnels' execution is a critical element of the Florence underpass project, which foresees the simultaneous construction of the two infrastructures. The project's complexities and the interference between the various construction phases have been studied and resolved by developing the entire project in a Building Information Modeling (BIM) environment. In particular, the implemented four-dimensional (4D) BIM model managed to simulate the possible macrophases and identify an optimal construction solution or, at least, the crucial actions to be taken to ensure the simultaneous construction of the station and tunnels. The 4D BIM model allowed an accurate simulation of the specific critical construction phases by identifying spatial interferences between completed works, temporary structures, and overlapping interventions. Consequently, it was possible to adopt appropriate technical solutions and develop a reliable work plan. In addition, it was possible to verify the potential scenarios of the TBM passage through the excavated station, which allowed to foresee some specific interventions needed to ensure works' continuity. The BIM methodology also allowed to find optimal solutions in a reasonable time, preventing a significant use of resources. © 2022, Ernst und Sohn. All rights reserved.
引用
收藏
页码:201 / 206
页数:5
相关论文
共 50 条
  • [2] Dynamic Response of Canopy Accessory Structure of High-Speed Railway Station
    Liu B.
    Li W.
    Hu H.
    Feng H.
    Xu A.
    Zhang Q.
    Zhongguo Tiedao Kexue/China Railway Science, 2023, 44 (01): : 39 - 49
  • [3] Evaluation of Transfer System of High-Speed Railway Station Based on the Integration of Station City
    Tao, Siyu
    Xie, Xin
    PROCEEDINGS OF THE SIXTH INTERNATIONAL CONFERENCE ON TRANSPORTATION ENGINEERING (ICTE 2019), 2019, : 632 - 642
  • [4] Building a high-speed railway station in Girona
    Baldellou, V. Pujol
    Acosta, J. Tomas
    Moreno, C. Ramos
    Bengoechea, Á.C. Aparicio
    Schneider, G. Ramos
    Civil-Comp Proceedings, 2012, 98
  • [5] Construction of the Korean high-speed railway
    Kee-dong, Kang
    Rail International, 2000, 31 (10):
  • [6] Risk Analysis of a Railway Station in Shenyang with Cover Excavation and Top-Down Method
    Wang, Fengchi
    Chen, Jiaxi
    Wen, Yizhen
    6TH INTERNATIONAL CONFERENCE ON ENVIRONMENTAL SCIENCE AND CIVIL ENGINEERING, 2020, 455
  • [7] The new Guillemins station - a railway station for high-speed trains
    Cremer, Jean-Marie
    de Goyet, Vincent de Ville
    Counasse, Clement
    Duchene, Yves
    Fagnoul, Veronique
    STAHLBAU, 2011, 80 (01) : 46 - 60
  • [8] Numerical Simulation on Top-down Construction Method of Subway Station in Hefei
    Ding, Kewei
    Guo, Naiyang
    PROCEEDINGS OF THE INTERNATIONAL CONFERENCE ON LOGISTICS, ENGINEERING, MANAGEMENT AND COMPUTER SCIENCE (LEMCS 2015), 2015, 117 : 1731 - 1734
  • [9] The station location and sustainability of high-speed railway systems
    Watson, Inara
    Ali, Amer
    Bayyati, Ali
    INFRASTRUCTURE ASSET MANAGEMENT, 2021,
  • [10] The station location and sustainability of high-speed railway systems
    Watson, Inara
    Ali, Amer
    Bayyati, Ali
    INFRASTRUCTURE ASSET MANAGEMENT, 2021, 9 (02) : 60 - 72