共 13 条
- [1] Browning T.R., Eppinger S.D., Modeling impacts of process architecture on cost and schedule risk in product development, IEEE Transactions on Engineering Management, 49, 4, pp. 428-442, (2002)
- [2] Cho S.H., Eppinger S.D., A simulation-based process model for managing complex design projects, IEEE Transactions on Engineering Management, 52, 3, pp. 316-328, (2005)
- [3] Chen D.Y., Qiu W.H., Yang Q., Et al., DSM-based complex product development process optimization using genetic algorithm, Control & Decision, 23, 8, pp. 910-914, (2008)
- [4] Yang Q., Lu J.F., Project optimization and simulation based on DSM rework risk evaluation matrix, Systems Engineering-Theory & Practice, 30, 9, pp. 1665-1671, (2010)
- [5] Collins S.T., Yassine A.A., Borgatti S.P., Evaluating product development systems using network analysis, Systems Engineering, 12, 1, pp. 55-68, (2009)
- [6] Rebentisch E., Schuh G., Riesener M., Et al., Assessment of changes in technical systems and their effects on cost and duration based on structural complexity, Procedia CIRP, 55, pp. 35-40, (2016)
- [7] Ahmad N., Wynn D.C., Clarkson J.P., Estimating the process cost of implementing engineering change alternatives, Nordic Conference on Product Lifecycle Management, pp. 1-14, (2009)
- [8] Wu Z.Y., Liu X.X., Li L., Et al., Multi-objective optimization for task assignment problem of product development, Control & Decision, 27, 4, pp. 598-602, (2012)
- [9] Dridi O., Krichen S., Guitouni A., A multiobjective hybrid ant colony optimization approach applied to the assignment and scheduling problem, International Transactions in Operational Research, 21, 6, pp. 935-953, (2014)
- [10] Cheng H., Chu X., Task assignment with multiskilled employees and multiple modes for product development projects, International Journal of Advanced Manufacturing Technology, 61, 1, pp. 391-403, (2012)