Study of Span Arrangement Options for Changtai Changjiang River Bridge

被引:0
|
作者
Hu, Yong [1 ]
Zhao, Wei-Yang [1 ]
机构
[1] China Railway Major Bridge Reconnaissance & Design Institute Co., Ltd., Wuhan,430056, China
关键词
Arch bridges - Navigation - Cable stayed bridges - Rivers - Arches;
D O I
暂无
中图分类号
学科分类号
摘要
Based on the analysis and prediction of the riverbed evolution at the bridge site, different navigable span arrangement and pier distribution solutions were analyzed and verified for Changtai Changjiang River Bridge, taking into account the related factors, such as watercourse condition, navigation channel condition and the navigation environment. According to the results of the analysis and verification, the main navigational channel bridge of Changtai Changjiang River Bridge is designed as a cable-stayed bridge with a main span of 1 176 m and two side spans of 490 m, while the left branch (Tianxing Islet side) and right branch (Lu'an Islet side) are arch bridges with main spans of 388 m and side spans of 168 m. The navigable spans in the final design are all capable of crossing the regions exhibiting navigation channel change over years and the navigable waters, aiming to reduce the influence of bridge on the distribution of 12.5 m-deep navigation channel and special navigation channel as well as the normal service of adjacent harbors, bank slopes and stability of lower shoal at the tail of Tianxing Islet to the minimum. In addition, the probability of ship-bridge collision is low, thereby the potential risks are reduced. © 2021, Journal Press, China Railway Bridge Science Research Institute, Ltd. All right reserved.
引用
收藏
页码:1 / 7
相关论文
共 50 条
  • [1] Aesthetic Design of Changtai Changjiang River Bridge
    Yu, Lu
    Bridge Construction, 2020, 50 (05) : 96 - 100
  • [2] Design of Special Ship Channel Bridge of Changtai Changjiang River Bridge
    Xu, Wei
    Wang, Heng
    Li, Shao-Jun
    Bridge Construction, 2020, 50 (06) : 85 - 90
  • [3] Study of Combined Effects of Wind and Thermal Loads on Changtai Changjiang River Bridge
    Hu, Jun
    Zheng, Qing-Gang
    Zhang, Wen-Ming
    Bridge Construction, 2020, 50 (04) : 42 - 47
  • [4] Pylon Design for Main Navigational Channel Bridge of Changtai Changjiang River Bridge
    Zhang, Jin-Tao
    Fu, Zhan-Gong
    Qin, Shun-Quan
    Jiang, Zhen-Xiong
    Zhang, Rui
    Bridge Construction, 2022, 52 (05) : 1 - 7
  • [5] Research on Pylon Types for Main Navigational Channel Bridge of Changtai Changjiang River Bridge
    Qin, Shun-Quan
    Zhang, Jin-Tao
    Lu, Qin-Feng
    Fu, Zhan-Gong
    Zhang, Rui
    Bridge Construction, 2021, 51 (04) : 1 - 9
  • [6] Overall Design and Concept Development for Main Navigational Channel Bridge of Changtai Changjiang River Bridge
    Qin, Shun-Quan
    Xu, Wei
    Lu, Qin-Feng
    Zheng, Qing-Gang
    Fu, Zhan-Gong
    Yuan, Ren-An
    Sun, Jian-Li
    Bridge Construction, 2020, 50 (03) : 1 - 10
  • [7] Research on Pylon Foundation Types for Main Navigational Channel Bridge of Changtai Changjiang River Bridge
    Hu, Yong
    Bridge Construction, 2021, 51 (02) : 1 - 9
  • [8] Analysis of Wind-Train-Track-Bridge Interaction for Main Bridge of Changtai Changjiang River Bridge
    Li, Xiao-Zhen
    Li, Xing-Xing
    Shu, Xiao-Feng
    Liu, De-Jun
    Bridge Construction, 2021, 51 (03) : 17 - 24
  • [9] Lateral Offset of Pylons of Main Navigational Channel Bridge of Changtai Changjiang River Bridge and Control Solutions
    Zhang M.-J.
    Zhou Y.-Z.
    Shen K.-J.
    Yuan R.-A.
    Zheng Q.-G.
    Bridge Construction, 2023, 53 (01) : 1 - 8
  • [10] Design of Structural System and Steel Girder for Main Navigational Channel Bridge of Changtai Changjiang River Bridge
    Xu, Wei
    Yuan, Ren-An
    Wang, Qiang
    Zheng, Qing-Gang
    Fu, Zhan-Gong
    Bridge Construction, 2021, 51 (03) : 1 - 8