An equivalent conversion method for dual-armed multi-cluster tool scheduling problems with multi-wafer types

被引:0
|
作者
Wang Z. [1 ]
Zhou B. [2 ]
Lu Z. [2 ]
Trentesaux D. [3 ]
Bekrar A. [3 ]
机构
[1] Logistics Engineering College, Shanghai Maritime University, Shanghai
[2] School of Mechanical Engineering, Tongji University, Shanghai
[3] LAMIH, UMR CNRS 8201, University of Valenciennes and Hainaut-Cambrésis, Valenciennes
基金
中国国家自然科学基金;
关键词
Algorithm; Multi-wafer types; Residency constraints; Scheduling; Semiconductor manufacturing;
D O I
10.1504/IJMTM.2019.100157
中图分类号
学科分类号
摘要
Due to the trend towards 450 mm diameter wafers and customisation, an increase in wafer diversity and transient operation are anticipated for multi-cluster tools in wafer fabrication. While most previous studies focus on steady state scheduling problem of cluster tools, research on multi-cluster tools scheduling problems with transient operations is still at early stage. This article addresses the dual-armed multi-cluster tools scheduling problem with transient operations and multiple wafer types. The problem is subject to residency constraints and makespan is adopted as the performance metrics. A non-linear mathematical model of the problem is established. To solve this problem, a time constraint sets-based heuristic algorithm, called the TB algorithm, is proposed in this article. Based on SWAP strategy, this article proposed the conception of virtual buffer modules, thus the TB algorithm converts the dual-armed multi-cluster tool scheduling problem into single-armed multi-cluster tools scheduling problem equivalently. Experimental results indicate that the proposed algorithm is feasible and efficient. Copyright © 2019 Inderscience Enterprises Ltd.
引用
收藏
页码:14 / 36
页数:22
相关论文
共 31 条
  • [1] Deadlock Avoidance Poolicy for Dual-armed Multi-cluster Tools with Multi-flow
    Watanabe, Yushin
    Nishi, Tatsushi
    [J]. 2013 IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT (IEEM 2013), 2013, : 611 - 615
  • [2] Optimally Scheduling Dual-Arm Multi-Cluster Tools to Process Two Wafer Types
    Zhu, QingHua
    Wang, GengHong
    Hou, Yan
    Wu, NaiQi
    Qiao, Yan
    [J]. IEEE ROBOTICS AND AUTOMATION LETTERS, 2022, 7 (03) : 5920 - 5927
  • [3] Scheduling Dual-Armed Cluster Tools for Concurrent Processing of Multiple Wafer Types With Identical Job Flows
    Ko, Sung-Gil
    Yu, Tae-Sun
    Lee, Tae-Eog
    [J]. IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, 2019, 16 (03) : 1058 - 1070
  • [4] Scheduling method for multi-cluster tools with diverse wafer flow patterns
    Zhou, Bing-Hai
    Li, Ming
    [J]. Dongbei Daxue Xuebao/Journal of Northeastern University, 2016, 37 (05): : 697 - 701
  • [5] Green scheduling of dual-armed cluster tool based on cleaning scenarios
    Nie, Qing
    Zhang, Binqi
    [J]. CLEANER LOGISTICS AND SUPPLY CHAIN, 2022, 4
  • [6] Noncyclic scheduling of dual-armed cluster tools for minimization of wafer residency time and makespan
    Sakai, Masaru
    Nishi, Tatsushi
    [J]. ADVANCES IN MECHANICAL ENGINEERING, 2017, 9 (04): : 1 - 12
  • [7] Integrated Scheduling of a Dual-Armed Cluster Tool for Maximizing Steady Schedule Patterns
    Kim, Woojin
    Yu, Tae-Sun
    Lee, Tae-Eog
    [J]. IEEE TRANSACTIONS ON SYSTEMS MAN CYBERNETICS-SYSTEMS, 2021, 51 (12): : 7282 - 7294
  • [8] Scheduling and optimization of mixed-processing with multi-variety wafers in dual-armed cluster tools
    Pan, Chunrong
    Zhao, Kun
    Lu, Yanjun
    Zhang, Fei
    [J]. JOURNAL OF THE CHINESE INSTITUTE OF ENGINEERS, 2018, 41 (06) : 529 - 538
  • [9] Wafer Delay Analysis and Workload Balancing of Parallel Chambers for Dual-Armed Cluster Tools With Multiple Wafer Types
    Ko, Sung-Gil
    Yu, Tae-Sun
    Lee, Tae-Eog
    [J]. IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, 2021, 18 (03) : 1516 - 1526
  • [10] Analysis and Control of Wafer Delays in a Dual-Armed Cluster Tool for a K-Cyclic Schedule
    Roh, Dong-Hyun
    Lee, Tae-Eog
    [J]. 2016 IEEE INTERNATIONAL CONFERENCE ON SYSTEMS, MAN, AND CYBERNETICS (SMC), 2016, : 418 - 423