Solving multi-objective green flexible job shop scheduling problem by an improved chimp optimization algorithm

被引:0
|
作者
Luan, Fei [1 ,2 ]
Tang, Biao [1 ]
Li, Ye [3 ]
Liu, Shi Qiang [4 ]
Yang, Xueqin [1 ]
Masoud, Mahmoud [5 ,6 ]
Feng, Baoyu [7 ]
机构
[1] College of Mechanical and Electrical Engineering, Shaanxi University of Science & Technology, Shaanxi, Xi’an, China
[2] Shaanxi Research Institute of Agricultural Products Processing Technology, Shaanxi, Xi’an, China
[3] Ulster College, Shaanxi University of Science & Technology, Shaanxi, Xi’an, China
[4] School of Economics and Management, Fuzhou University, Fujian, Fuzhou, China
[5] Department of Information Systems and Operations Management, King Fahd University of Petroleum & Minerals, Dhahran, Saudi Arabia
[6] Center for Smart Mobility and Logistics, King Fahd University of Petroleum & Minerals, Dhahran, Saudi Arabia
[7] Xi’an Natural Gas Engineering Co., Ltd, Shaanxi, Xi’an, China
来源
关键词
Carbon - Job shop scheduling - Multiobjective optimization;
D O I
10.3233/JIFS-236157
中图分类号
学科分类号
摘要
As environmental contamination becomes more and more severe, enterprises need to consider optimizing environmental criteria while optimizing production criteria. In this study, a multi-objective green flexible job shop scheduling problem (MO GFJSP) is established with two objective functions: the makespan and the carbon emission. To effectively solve the MO GFJSP, an improved chimp optimization algorithm (IChOA) is designed. The proposed IChOA has four main innovative aspects: 1) the fast non-dominated sorting (FDS) method is introduced to compare the individuals with multiple objectives and strengthen the solution accuracy.2) a dynamic convergence factor (DCF) is introduced to strengthen the capabilities of exploration and exploitation. 3) the position weight (PW) is used in the individual position updating to enhance the search efficiency.4) the variable neighborhood search (VNS) is developed to strengthen the capacity to get out of – escape the local optimum. By executing abundant experiments using 20 benchmark instances, it was demonstrated that the developed IChOA is efficient to solve the MO GFJSP and effective for reducing carbon emission in the flexible job shop. © 2024 – IOS Press. All rights reserved.
引用
收藏
页码:7697 / 7710
相关论文
共 50 条
  • [1] An improved multi-objective optimization algorithm for solving flexible job shop scheduling problem with variable batches
    WU Xiuli
    PENG Junjian
    XIE Zirun
    ZHAO Ning
    WU Shaomin
    [J]. Journal of Systems Engineering and Electronics, 2021, 32 (02) : 272 - 285
  • [2] An improved multi-objective optimization algorithm for solving flexible job shop scheduling problem with variable batches
    Wu Xiuli
    Peng Junjian
    Xie Zirun
    Zhao Ning
    Wu Shaomin
    [J]. JOURNAL OF SYSTEMS ENGINEERING AND ELECTRONICS, 2021, 32 (02) : 272 - 285
  • [3] Improved Heuristic Kalman Algorithm for Solving Multi-Objective Flexible Job Shop Scheduling Problem
    Robert, Ojstersek
    Zhang Hankun
    Liu Shifeng
    Borut, Buchmeister
    [J]. 28TH INTERNATIONAL CONFERENCE ON FLEXIBLE AUTOMATION AND INTELLIGENT MANUFACTURING (FAIM2018): GLOBAL INTEGRATION OF INTELLIGENT MANUFACTURING AND SMART INDUSTRY FOR GOOD OF HUMANITY, 2018, 17 : 895 - 902
  • [4] The Improved Genetic Algorithm for Multi-objective Flexible Job Shop Scheduling Problem
    Yang, Jian Jun
    Ju, Lu Yan
    Liu, Bao Ye
    [J]. MECHANICAL, MATERIALS AND MANUFACTURING ENGINEERING, PTS 1-3, 2011, 66-68 : 870 - 875
  • [5] Flexible Job Shop Scheduling Problem Based on Multi-Objective Optimization Algorithm
    Zhang, Li
    Wang, Lu
    [J]. PROCEEDINGS OF THE 2018 INTERNATIONAL CONFERENCE ON MECHANICAL, ELECTRONIC, CONTROL AND AUTOMATION ENGINEERING (MECAE 2018), 2018, 149 : 580 - 588
  • [6] IMPROVED BACTERIA FORAGING OPTIMIZATION ALGORITHM FOR MULTI-OBJECTIVE FLEXIBLE JOB-SHOP SCHEDULING PROBLEM
    Ning, Tao
    Guo, Chen
    Chen, Rong
    Jin, Hua
    [J]. JOURNAL OF INVESTIGATIVE MEDICINE, 2015, 63 (08) : S34 - S34
  • [7] An Improved Genetic Algorithm for Multi-objective Flexible Job-shop Scheduling Problem
    Zhang, Chaoyong
    Wang, Xiaojuan
    Gao, Liang
    [J]. MANUFACTURING SCIENCE AND ENGINEERING, PTS 1-5, 2010, 97-101 : 2449 - 2454
  • [8] An Improved Ant Colony Algorithm for Multi-objective Flexible Job Shop Scheduling Problem
    Li, Li
    Wang, Keqi
    [J]. 2009 IEEE INTERNATIONAL CONFERENCE ON AUTOMATION AND LOGISTICS ( ICAL 2009), VOLS 1-3, 2009, : 697 - +
  • [9] An improved quantum particle swarm algorithm for solving multi-objective fuzzy flexible job shop scheduling problem
    Liu, Weiling
    Xu, Jinliang
    Ren, Guoqing
    Xiao, Yanjun
    [J]. JOURNAL OF INTELLIGENT & FUZZY SYSTEMS, 2023, 45 (03) : 4885 - 4905
  • [10] Improved PSO algorithm for multi-objective optimization flexible job shop scheduling problems
    Bai, Junjie
    Wang, Ningsheng
    Tang, Dunbing
    [J]. Nanjing Hangkong Hangtian Daxue Xuebao/Journal of Nanjing University of Aeronautics and Astronautics, 2010, 42 (04): : 447 - 453