Sequence Planning Method for Robotic On-orbit Assemly of Space Truss Structure

被引:0
|
作者
Luo J.-J. [1 ,2 ]
Wang J.-W. [1 ,2 ]
Wang M.-M. [1 ,2 ]
Liu C. [1 ,2 ]
机构
[1] Research & Development Institute of Northwestern Polytechnical University in Shenzhen, Shenzhen
[2] School of Astronautics, Northwestern Polytechnical University, Xi'an
来源
Yuhang Xuebao/Journal of Astronautics | 2021年 / 42卷 / 04期
关键词
Assembly sequence planning; Discrete particle swarm optimization; On-orbit assembly; Robot; Space truss structure;
D O I
10.3873/j.issn.1000-1328.2021.04.004
中图分类号
学科分类号
摘要
Aiming at the assembly sequence planning of space truss structure constructed by robot on orbit, a method is proposed to solve the assembly unit sequence and robot motion simultaneously. Firstly, the assembly robot is designed and its dynamic model is established. Secondly, robot motions in the whole assembly process are classified and the planning and control methods are given. Then, the evaluation index of assembly sequence planning is established and is optimized through discrete particle swarm optimization. Finally, simulation of a common spatial truss structure assembly is perfound to verify the effectiveness of the proposed method. © 2021, Editorial Dept. of JA. All right reserved.
引用
收藏
页码:437 / 449
页数:12
相关论文
共 39 条
  • [1] Tan Chun-lin, Liu Yong-jian, Yu Deng-yun, Research on system of on-orbit spacecraft maintenance and servicing, Spacecraft Engineering, 17, 3, pp. 45-50, (2008)
  • [2] Guo Ji-feng, Wang Ping, Cui Nai-gang, Development of on-orbit assembly of large space structures, Missiles and Space Vehicles, 3, pp. 28-35, (2006)
  • [3] Huang Pan-feng, Chang Hai-tao, Lu Zhen-yu, Et al., Key techniques of on-orbit service-oriented reconfigurable cellularized satellite and its prospects, Journal of Astronautics, 37, 1, pp. 4-13, (2008)
  • [4] Homem-de-Mello L S., Sequence planning for robotic assembly of tetrahedral truss structures, IEEE transactions on systems, man, and cybernetics, 25, 2, pp. 304-312, (1995)
  • [5] Watson J J, Collins T J, Bush H G., A history of astronaut construction of large space structures at NASA Langley Research Center, IEEE Aerospace Conference, (2002)
  • [6] Heard W L, Bush H G, Wallson R E, Et al., A mobile work station concept for mechanically aided astronaut assembly of large space trusses, NASA, (1983)
  • [7] Heard W L, Watson J, Ross J, Et al., Results of the ACCESS space construction shuttle flight experiment, The 2nd Aerospace Maintenance Conference, (1986)
  • [8] Ogilvie A, Allport J, Hannah M, Et al., Autonomous satellite servicing using the orbital express demonstration manipulator system, The 9th International Symposium on Artificial Intelligence, Robotics and Automation in Space, pp. 25-29, (2008)
  • [9] Inaba N, Oda M., Autonomous satellite capture by a space robot: world first on-orbit experiment on a Japanese robot satellite ETS-VII, IEEE International Conference on Robotics and Automation, (2000)
  • [10] Piedboeuf J C, Carufel J D, Aghili F, Et al., Task verification facility for the Canadian special purpose dexterous manipulator, IEEE International Conference on Robotics and Automation, (2002)