共 27 条
- [1] GONG Wenping, WANG Lei, JUANG C H, Et al., Robust geotechnical design of shield-driven tunnels[J], Computers and Geotechnics, 56, (2014)
- [2] YU Honggan, TAO Jianfeng, HUANG Sheng, Et al., A field parameters-based method for real-time wear estimation of disc cutter on TBM cutterhead, Automation in Construction, 124, (2021)
- [3] OZDEMIR L., Development of theoretical equations for predicting tunnel boreability, pp. 264-270, (1977)
- [4] BRULAND A., Hard rock tunnel boring, pp. 14-31, (1998)
- [5] LI Jie, ZHANG Bin, FU Ke, Et al., Site data based prediction of shield driving performance in compound strata, Modern Tunnelling Technology, 56, 4, (2019)
- [6] XING Tong, GONG Guofang, YANG Huayong, Torque calculation model of cutting head in shield machine and experimental study, Journal of Zhejiang University (Engineering Science), 43, 10, (2009)
- [7] SALIMI A, ROSTAMI J, MOORMANN C, Et al., Application of non-linear regression analysis and artificial intelligence algorithms for performance prediction of hard rock TBMs[J], Tunnelling and Underground Space Technology, 58, (2016)
- [8] SUN Wei, SHI Maolin, ZHANG Chao, Et al., Dynamic load prediction of tunnel boring machine(TBM) based on heterogeneous in situ data[J], Automation in Construction, 92, (2018)
- [9] GAO Xianjie, SHI Maolin, SONG Xueguan, Et al., Recurrent neural networks for real-time prediction of TBM operating parameters[J], Automation in Construction, 98, pp. 225-235, (2019)
- [10] YAN Changbin, WANG Hejian, YANG Jihua, Et al., Predicting TBM penetration rate with the coupled model of partial least squares regression and deep neural network, Rock and Soil Mechanics, 42, 2, (2021)