Reliability analysis of cold standby parallel system possessing failure and repair rate under geometric distribution

被引:0
|
作者
Bhatti J. [1 ]
Kakkar M.K. [1 ]
机构
[1] Chitkara University, Institute of Engineering and Technology, Chitkara University, Chandigarh, Punjab
关键词
Availability; Busy period; Geometric distribution; Inspection; Profit function; Repair rate;
D O I
10.2174/2666255813666191219110504
中图分类号
学科分类号
摘要
Background and Aim: With an increase in demands about the reliability of industrial machines following continuous or discrete distribution, the important thing to be noticed is that in all previous research works where systems had more than one failure, no iteration technique was studied to separate the failed unit on the basis of its failure. Therefore, the aim of our paper is to analyze the real industrial problems following cold standby units arranged in parallel manner with the new concept of inspection procedure for failed units to detect the exact failure and being the communicator to the repairman for repairing the exact failed part of the unit for saving time and maintenance cost. Methods: The geometric distribution and regenerative techniques were applied for calculating different reliability measures like mean time to system failure, availability of a system, inspection, repair and the time of unit failure. Results: Graphical and analytical analyses were also conducted to analyze the increasing/decreasing behavior of profit function w.r.t repair and failure rate. The system responded properly in fulfilling the basic needs. Conclusion: The calculated value of all reliability parameters proved helpful for studying any other models following the same concept under different environmental conditions. Thus, it can be con-cluded that, reliability increases with an increase in the repair and decreases with an increase in the failure rate. Also, the results evaluated in this paper provide the better reliability testing strategies that help develop new techniques which lead to increase the effectiveness of the system. © 2021 Bentham Science Publishers.
引用
收藏
页码:962 / 968
页数:6
相关论文
共 50 条
  • [1] Reliability Analysis of a Cold Standby System with Imperfect Repair and under Poisson Shocks
    Chen, Yutian
    Meng, Xianyun
    Chen, Shengqiang
    MATHEMATICAL PROBLEMS IN ENGINEERING, 2014, 2014
  • [2] Reliability modelling of a parallel-cold standby system with proviso of repair priority
    Malik, S. C.
    Rathi, Puran
    Nandal, N.
    JOURNAL OF STATISTICS AND MANAGEMENT SYSTEMS, 2023, 26 (04) : 867 - 883
  • [3] Copula-based reliability analysis for a parallel system with a cold standby
    Zhang Yongjin
    Sun Youchao
    Li Longbiao
    Zhao Ming
    COMMUNICATIONS IN STATISTICS-THEORY AND METHODS, 2018, 47 (03) : 562 - 582
  • [4] Copula-based reliability analysis for a parallel system with a cold standby
    Yongjin Z.
    Youchao S.
    Longbiao L.
    Ming Z.
    Ming, Zhao (IIEE_Mzhao@163.com), 2018, Bellwether Publishing, Ltd. (47) : 562 - 582
  • [5] Reliability analysis for a cold standby system under stepwise Poisson shocks
    Ge, Xin
    Sun, Jiali
    Wu, Qingtai
    JOURNAL OF CONTROL AND DECISION, 2021, 8 (01) : 27 - 40
  • [6] RELIABILITY MEASURES OF A COLD STANDBY SYSTEM WITH PREVENTIVE MAINTENANCE AND REPAIR
    Malik, S. C.
    Barak, Sudesh K.
    INTERNATIONAL JOURNAL OF RELIABILITY QUALITY & SAFETY ENGINEERING, 2013, 20 (06):
  • [7] Reliability indices of a redundant system with standby failure and arbitrary distribution for repair and replacement times
    Bhardwaj R.K.
    Kaur K.
    Malik S.C.
    International Journal of System Assurance Engineering and Management, 2017, 8 (2) : 423 - 431
  • [8] RELIABILITY EVALUATION OF COLD STANDBY REPAIRABLE SYSTEM BASED ON GEOMETRIC PROCESS
    Wu, Yuegin
    Fu, Yun
    Wang, Qihua
    Ma, Yuan
    ICIM 2010: PROCEEDINGS OF THE TENTH INTERNATIONAL CONFERENCE ON INDUSTRIAL MANAGEMENT, 2010, : 437 - +
  • [9] RELIABILITY AND AVAILABILITY ANALYSIS OF COLD STANDBY SYSTEM WITH REPAIR AND MULTIPLE NONCRITICAL AND CRITICAL ERRORS
    CHUNG, WK
    MICROELECTRONICS AND RELIABILITY, 1994, 34 (12): : 1891 - 1896
  • [10] A geometric process repair model for a repairable cold standby system with priority in use and repair
    Zhang, Yuan Lin
    Wang, Guan Jun
    RELIABILITY ENGINEERING & SYSTEM SAFETY, 2009, 94 (11) : 1782 - 1787