共 33 条
- [1] JIN Dalong, YUANG Dajun, LI Xinggao, Et al., Probabilistic analysis of the disc cutter failure during TBM tunneling in hard rock, Tunnelling and Underground Space Technology, 109, (2021)
- [2] LI Xingchun, LI Xinggao, YUANG Dajun, Application of an interval wear analysis method to cutting tools used in tunneling shields in soft ground, Wear, 392, (2017)
- [3] REN Dongjie, SHEN Shuilong, ARULRAJAH A, Et al., Prediction model of TBM disc cutter wear during tunnelling in heterogeneous ground, Rock Mechanics and Rock Engineering, 51, 11, (2018)
- [4] MASSOUD B, JAFAR K H., A case study on TBM tunnelling in fault zones and lessons learned from ground improvement, Tunnelling and Underground Space Technology, 63, (2017)
- [5] FARROKH E, KIM D Y., A discussion on hard rock TBM cutter wear and cutterhead intervention interval length evaluation, Tunnelling and Underground Space Technology, 81, (2018)
- [6] LIN Laikuang, MAO Qingsong, XIA Yimin, Et al., Experimental study of specific matching characteristics of tunnel boring machine cutter ring properties and rock [J], Wear, 378, (2017)
- [7] SU Weiling, LI Xinggao, JIN Dalong, Et al., Analysis and prediction of TBM disc cutter wear when tunneling in hard rock strata: a case study of a metro tunnel excavation in Shenzhen, China, Wear, 446, (2020)
- [8] ZHANG Weisen, Characteristics of disc cutter failures in mixed-face ground condition, Chinese Journal of Underground Space and Engineering, 15, 2, (2019)
- [9] LI Qiang, GAN Penglu, On cutter wearing control technology of the shield passing through mixed strata, Modearn Tunneling Technology, 57, 1, (2020)
- [10] YU Lei, ZHANG Sherong, SUN Wen, Et al., Prediction model for TBM disc cutter wear based on dense core theory, Chinese Journal of Geotechnical Engineering, 44, 5, (2022)