Optimization and improvement of multiple LNG high-pressure pumps in parallel operation

被引:0
|
作者
Peng C. [1 ]
机构
[1] PetroChina JingTang Liquefied Natural Gas Co., Ltd., Tangshan, 063200, Hebei
关键词
Check valve; Flow rate distribution; High-pressure pump; LNG receiving terminal; Operational risk; Optimization measure; Parallel operation; Tangshan;
D O I
10.3787/j.issn.1000-0976.2019.09.014
中图分类号
学科分类号
摘要
With the continuous increase of China's imported LNG, some large-scale LNG receiving terminals in China have begun to be expanded to improve their gasification and transportation capacity. The technical problems arising from parallel operation of multiple high-pressure pumps were sorted out based on the data of four years' successful operation of the phase II project of the PetroChina Tangshan LNG receiving terminal. The causes of these problems were analyzed according to design data, pipeline layout and interlock protection logic, and the main factors influencing the flow rate distribution between multiple high-pressure pumps were determined. The measures for optimizing and improving the related operation modes and technological process were proposed.
引用
收藏
页码:110 / 116
页数:6
相关论文
共 30 条
  • [1] Yang J., Analysis of sustainable development of natural gas market in China, Natural Gas Industry, 38, 4, pp. 145-152, (2018)
  • [2] Gao Z., Zhou Y., Stage analysis and prospects of natural gas market development in China, International Petroleum Economics, 26, 10, pp. 69-76, (2018)
  • [3] Liu S., Wei G., Wang L., Luo Z., Commissioning technology and management of additional facilities of an LNG receiving terminal: A case history of Dapeng, Natural Gas Industry, 31, 1, pp. 90-92, (2011)
  • [4] Liu B., Guo K., Wei G., Gao Y., Li N., Huangpu L., Optimization of economic operation for LNG receiving terminal, Chemical Engineering of Oil & Gas, 47, 5, pp. 39-44, (2018)
  • [5] Chen W., Design of DCS system for the second phase of Tangshan LNG receiving station, (2018)
  • [6] Chu Y., Chen W., Niu J., Liu X., The applied technology of LNG receiving terminal (Ⅱ), Natural Gas Industry, 27, 1, pp. 124-127, (2007)
  • [7] Chen W., Jin Y., Wang T., Zhang Z., Quality control in the key links of LNG terminal's commissioning, Oil & Gas Storage and Transportation, 37, 9, pp. 1018-1024, (2018)
  • [8] Liu S., Jiao W., Numerical simulation on the vaporization, heat transfer and flow pattern inside the tube of LNG ambient air vaporizer, Oil & Gas Storage and Transportation, 36, 8, pp. 918-923, (2017)
  • [9] Yang Y., Tang W., Qi A., Sun G., Zhu H., Ma Y., Energy consumption analysis and energy saving measures of large LNG plant, Chemical Engineering of Oil & Gas, 46, 4, pp. 103-108, (2017)
  • [10] Yang Y., Wang H., Zheng Y., Yu T., Zhu Z., Chen J., Program optimization and problems handling of start and resumption production of large-scale LNG plant, Chemical Engineering of Oil & Gas, 47, 2, pp. 57-64, (2018)