An integrated scheduling method of multi-AGV in large-scale industrial warehouses

被引:1
|
作者
Hu E. [1 ]
He J. [1 ]
Shen S. [1 ]
Wu R. [1 ]
机构
[1] School of Automation, Central South University, Changsha
来源
Zhongnan Daxue Xuebao (Ziran Kexue Ban)/Journal of Central South University (Science and Technology) | 2023年 / 54卷 / 05期
基金
中国国家自然科学基金;
关键词
automated guided vehicle(AGV); collision conflicts; comprehensive optimization scheduling; path planning; task sequencing assignment;
D O I
10.11817/j.issn.1672-7207.2023.05.013
中图分类号
学科分类号
摘要
To address the inefficiency of automated guided vehicle(AGV) fleets in large-scale industrial warehouses, an integrated scheduling method based on hierarchical planning was proposed, which decomposed the scheduling problem into an aggregated upper-level task sequencing assignment problem and a lower-level path planning problem. An elite solution set was generated in the upper-level problem, and the tabu list generated by the lower-level path planning was integrated into the iteration search process as collision conflict constraints for upper-level problem. In iteration search processes, the elite solution of the upper-level problem with a large number of collision conflicts obtained by the path planning was continuously excluded by updating the upper-level elite solution set and the lower-level tabu list, to obtain the solution with the best overall performance. Further integrating path search and tabu lists to achieve simultaneous optimization of multiple interrelated problems in AGV scheduling, the effectiveness of the method was verified by a large-scale industrial warehouse case. The results show that, compared to the sequential optimization scheduling method, the completed time and delay time due to collision conflicts of an integrated scheduling method reduce 10.56% and 74.53%, respectivelty. For large-scale problems, compared to the hybrid adaptive large neighborhood search algorithm and the pre-planning algorithm, the task completion time of an integrated scheduling method reduce by 9.73% and 5.54%, respectively, and the computation time reduce by 84.19% and 86.68%, respectively. © 2023 Central South University of Technology. All rights reserved.
引用
收藏
页码:1779 / 1790
页数:11
相关论文
共 20 条
  • [1] JIN Jian, ZHANG Xiaohua, Multi AGV scheduling problem in automated container terminal, Journal of Marine Science and Technology, 24, 1, pp. 32-38, (2016)
  • [2] TAO Qiuyun, SANG Hongyan, GUO Hengwei, Et al., Improved particle swarm optimization algorithm for AGV path planning, IEEE Access, 9, pp. 33522-33531, (2021)
  • [3] CHIEW K, QIN Shaowen, Scheduling and routing of AMOs in an intelligent transport system, IEEE Transactions on Intelligent Transportation Systems, 10, 3, pp. 547-552, (2009)
  • [4] YU Dingding, HU Xianliang, LIANG Kewei, Et al., A parallel algorithm for multi-AGV systems, Journal of Ambient Intelligence and Humanized Computing, 13, 4, pp. 2309-2323, (2022)
  • [5] CORREA A I, LANGEVIN A, ROUSSEAU L M, Scheduling and routing of automated guided vehicles: a hybrid approach, Computers & Operations Research, 34, 6, pp. 1688-1707, (2007)
  • [6] LI Guomin, LI Xinyu, GAO Liang, Et al., Tasks assigning and sequencing of multiple AGVs based on an improved harmony search algorithm, Journal of Ambient Intelligence and Humanized Computing, 10, 11, pp. 4533-4546, (2019)
  • [7] ZHANG Zheng, GUO Qing, CHEN Juan, Et al., Collision-free route planning for multiple AGVs in an automated warehouse based on collision classification, IEEE Access, 6, pp. 26022-26035, (2018)
  • [8] BAO Bizhen, DUAN Zhao, CHEN Wei, Mission scheduling of multi-AGV system with dynamic simulation, 2020 International Symposium on Autonomous Systems (ISAS), pp. 115-120, (2021)
  • [9] LIU Jian, WANG Zhongdong, XU Qing, Et al., Path scheduling for multi-AGV system based on two-staged traffic scheduling scheme and genetic algorithm, Journal of Computational Methods in Sciences and Engineering, 15, 2, pp. 163-169, (2015)
  • [10] KIM C W, TANCHOCO J M A, Conflict-free shortest-time bidirectional AGV routeing, International Journal of Production Research, 29, 12, pp. 2377-2391, (1991)