Process puzzler: Are relief revisions reasonable?

被引:0
|
作者
机构
来源
Chemical Processing | 2020年 / 82卷 / 12期
关键词
D O I
暂无
中图分类号
学科分类号
摘要
We completed an engineering package for a de-ethanizer system that is part of an overall expansion of a refinery (see figure). This involved replacing some lower trays because of fouling and capacity limitations and repairing corrosion in the feed tray and tubes in the air heat exchanger and water condenser. Construction is done. However, the pressure relief system — I did its initial design a few years ago but that has been significantly modified — troubles me.
引用
收藏
页码:35 / 41
相关论文
共 50 条
  • [1] Process puzzler: Be level-headed with solids
    Chemical Processing, 2019, 81 (09):
  • [2] Process puzzler: Do cranky centrifuges deserveanother turn?
    1600, Putman Publishing Company (82):
  • [3] Process puzzler: Don’t pull your punches with a knockout drum
    Chemical Processing, 2019, 81 (07):
  • [4] Process speed and reasonable length of process
    Callegari, Jose Antonio
    DERECHO Y CIENCIAS SOCIALES, 2011, (05): : 114 - 129
  • [5] COMPOSERS REVISIONS AND THE CREATIVE PROCESS
    BROWN, M
    COLLEGE MUSIC SYMPOSIUM, 1994, 33-4 : 93 - 111
  • [6] A Process for Compliance with Revisions to FDA Regulations
    David W. Johnson
    Nikola Coleman
    Kristi Kepler
    Wayne Millar
    Drug information journal : DIJ / Drug Information Association, 1998, 32 (2): : 393 - 399
  • [7] A process for compliance with revisions to FDA regulations
    Johnson, DW
    Coleman, N
    Kepler, K
    Millar, W
    DRUG INFORMATION JOURNAL, 1998, 32 (02): : 393 - 399
  • [8] IRS refuses relief for late S election, even with reasonable cause
    不详
    JOURNAL OF TAXATION, 2003, 99 (04): : 244 - 244
  • [9] Reasonable pressure-relief borehole spacing in coal of different strength
    Ge D.
    Li D.
    Jiang F.
    Wang C.
    Chen Y.
    Dong C.
    Sun S.
    Yang G.
    Caikuang yu Anquan Gongcheng Xuebao/Journal of Mining and Safety Engineering, 2020, 37 (03): : 578 - 585and593
  • [10] Recovery plan revisions: Progress or due process?
    Harvey, E
    Hoekstra, JM
    O'Connor, RJ
    Fagan, WF
    ECOLOGICAL APPLICATIONS, 2002, 12 (03) : 682 - 689