共 12 条
- [1] Yin R.-G., Zhang J.-H., Deng J.-H., Et al., Analyses of deformation and stress caused by geostress on rock-anchored beam of underground power house, Chinese Journal of Rock Mechanics and Engineering, 32, pp. 3681-3687, (2013)
- [2] Liu J., Yang H.-X., Analysis of the effect of stress release from underground cavern excavation on mechanical properties of rock anchor beams, Haihe Water Resources, 4, pp. 44-45, (2014)
- [3] Mou W.-J., Luo A., Liu B., Analysis of the influence of bedding rock mass on the stability of rock anchor beam of underground powerhouse, Shaanxi Water Resources, 5, pp. 133-135, (2014)
- [4] Xu F.-G., Gao J.-F., Wang J., Et al., Causes of cracks in rock anchor beams during construction of monkey rock underground powerhouse and countermeasures, Journal of Hydraulic Engineering, 46, pp. 242-247, (2015)
- [5] Dong J.-X., Xu G.-L., Shen Y.-J., Analysis of failure modes and stability of rock bench for rock-bolt crane beam during construction stage, Geological Science and Technology Information, 30, 6, pp. 133-137, (2011)
- [6] Liu L., Geological defects and overexcavation treatment of rock anchor crane beam in underground powerhouse of hadbut hydropower station, Technology Innovation and Application, 34, pp. 235-236, (2013)
- [7] Chen W.-B., Support design of rock bench and beam in large-scale underground cavern under complex geological conditions, Yunnan Water Power, 32, 1, pp. 38-41, (2016)
- [8] Dong X.-Y., Ma F.-Y., Case study on construction technology for rock anchored beam of Jinpin I hydropower station, Tunnel Construction, 31, 2, (2011)
- [9] Wang P., Yuan J.-C., Wen H.-W., Et al., Engineering geology special report on surrounding rock stability of right bank underground powerhouse in construction detailed drawing design stage of Baihetan Hydropower Station on Jinsha River, (2018)
- [10] Su H.-X., Wang P., Song G., Et al., Geological self-check report on safety identification of Baihetan hydropower station diversion tunnel, (2014)