Drill geometry and hole drilling

被引:0
|
作者
Akashi K.
机构
关键词
D O I
10.2493/jjspe.85.839
中图分类号
学科分类号
摘要
[No abstract available]
引用
收藏
页码:839 / 842
页数:3
相关论文
共 50 条
  • [1] Investigation of the effects of drill geometry on drilling performance and hole quality
    Yavuz, Mehtap
    Gokce, Huseyin
    Ciftci, Ibrahim
    Gokce, Harun
    Yavas, Caglar
    Seker, Ulvi
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2020, 106 (9-10): : 4623 - 4633
  • [2] Investigation of the effects of drill geometry on drilling performance and hole quality
    Mehtap Yavuz
    Hüseyin Gökçe
    İbrahim Çiftçi
    Harun Gökçe
    Çağlar Yavaş
    Ulvi Şeker
    The International Journal of Advanced Manufacturing Technology, 2020, 106 : 4623 - 4633
  • [3] POSITIONAL ACCURACY OF HOLE IN DRILLING - (EFFECT OF RIGIDITY AND POINT GEOMETRY OF DRILL)
    SAKUMA, K
    KIYOTA, H
    MORITA, H
    BULLETIN OF THE JSME-JAPAN SOCIETY OF MECHANICAL ENGINEERS, 1983, 26 (214): : 659 - 666
  • [4] Development of drill geometry for burr minimization in drilling
    Ko, SL
    Chang, JE
    CIRP ANNALS-MANUFACTURING TECHNOLOGY, 2003, 52 (01) : 45 - 48
  • [5] Drilling Burr Minimization by Changing Drill Geometry
    Franczyk, Emilia
    Slusarczyk, Lukasz
    Zebala, Wojciech
    MATERIALS, 2020, 13 (14)
  • [6] An investigation of different drill bits and drilling angles in blast hole drilling
    Akbay, D.
    Altindag, R.
    ROCK ENGINEERING AND ROCK MECHANICS: STRUCTURES IN AND ON ROCK MASSES, 2014, : 1033 - 1038
  • [7] Nanocrystallization of drill hole surface by high speed drilling
    Todaka, Y
    Umemoto, M
    Li, JG
    Tsuchiya, K
    METASTABLE, MECHANICALLY ALLOYED AND NANOCRYSTALLINE MATERIALS, 2005, 24-25 : 601 - 604
  • [8] Analysis on drilling parameters of blast-hole drill
    Li, Bin
    Gong, Zhaomin
    Tong, Jiexin
    Cailiao Baohu/Materials Protection, 1996, 29 (11): : 5 - 7
  • [9] FEM simulation of drilling processes with twist drill and deep-hole drill (Gundrill)
    Du, YZ
    Zhang, LH
    Bai, YJ
    PROCEEDINGS OF THE INTERNATIONAL CONFERENCE ON MECHANICAL ENGINEERING AND MECHANICS 2005, VOLS 1 AND 2, 2005, : 837 - 842
  • [10] Ecological deep hole drilling by novel coated and designed drill
    Honnogahara 1-15, Toyokawa 442-8544, Japan
    Key Eng Mat, 2007, (657-662):