Simulation study on cuttings transport of the backreaming operation for long horizontal section wells

被引:0
|
作者
YuFei Chen [1 ]
Hui Zhang [1 ]
WenXin Wu [2 ]
Jun Li [1 ]
Yong Ouyang [3 ]
ZongYu Lu [4 ]
DeXin Ma [5 ]
YongChuan Wu [5 ]
JunBo Liu [5 ]
KeRou Liu [1 ]
ZhuoXin Dong [1 ]
机构
[1] China University of Petroleum(Beijing)
[2] Beijing Normal University at Zhuhai, Experimental and Practical Education Innovation Center
[3] Oil & Gas Technology Research Institute of PetroChina Changqing Oilfield Company
[4] PetroChina Xinjiang Oilfield Company
[5] China Oilfield Services
关键词
D O I
暂无
中图分类号
学科分类号
摘要
The backreaming operation plays a significant role in safe drilling for horizontal wellbores, while it may cause severe stuck pipe accidents. To lower the risk of the stuck pipe in backreaming operations, the mechanism of cuttings transport needs to be carefully investigated. In this research, a transient cuttings transport with multiple flow patterns model is developed to predict the evolution of cuttings transported in the annulus while backreaming. The established model can provide predictions of the distribution of cuttings bed along the wellbore considering the bulldozer effect caused by large-size drilling tools(LSDTs). The sensitivity analyses of the size of LSDTs, and backreaming operating parameters are conducted in Section 4. And a new theory is proposed to explain the mechanism of cuttings transport in the backreaming operation, in which both the bit and LSDTs have the “cleaning effect” and “plugging effect”.The results demonstrate that the cuttings bed in annuli is in a state of dynamic equilibrium, but the overall trend and the distribution pattern are obvious. First, larger diameters and longer drilling tools could lead to a higher risk of the stuck pipe. Second, we find that it is not the case that the higher flow rate is always better for hole cleaning, so three flow-rate intervals are discussed separately under the given conditions. When the “dangerous flow rate”(<33 L/s in Case 4) is employed, the cuttings bed completely blocks the borehole near the step surface and causes a stuck pipe directly. If the flow rate increases to the “low flow rate” interval(33-35 L/s in Case 4), a smaller flow rate instead facilitates borehole cleaning. If the flow rate is large enough to be in the “high flow rate” interval(>35 L/s in Case 4),the higher the flow rate, the better the cleaning effect of cuttings beds. Third, an interval of tripping velocity called “dangerous velocity” is proposed, in which the cuttings bed accumulation near the LSDTs is more serious than those of other tripping velocities. As long as the applied tripping velocity is not within the “dangerous velocity”(0.4-0.5 m/s in Case 5) interval in the backreaming operation, the risk of the stuck pipe can be controlled validly. Finally, through the factors analyses of the annular geometry,particle properties, and fluid properties in Section 5, it can be found that the “low flow rate”, “high flow rate” and “dangers flow rate” tend to decrease and the “dangerous velocity” tends to increase with the conditions more favorable for hole cleaning. This study has some guiding significance for risk prediction and parameter setting of the backreaming operation.
引用
收藏
页码:1149 / 1170
页数:22
相关论文
共 50 条
  • [1] Simulation study on cuttings transport of the backreaming operation for long horizontal section wells
    Chen, Yu-Fei
    Zhang, Hui
    Wu, Wen-Xin
    Li, Jun
    Ouyang, Yong
    Lu, Zong-Yu
    Ma, De-Xin
    Wu, Yong-Chuan
    Liu, Ke-Rou
    Dong, Zhuo-Xin
    [J]. PETROLEUM SCIENCE, 2024, 21 (02) : 1149 - 1170
  • [2] Simulation study on cuttings transport of the backreaming operation for long horizontal section wells
    YuFei Chen
    Hui Zhang
    WenXin Wu
    Jun Li
    Yong Ouyang
    ZongYu Lu
    DeXin Ma
    YongChuan Wu
    JunBo Liu
    KeRou Liu
    ZhuoXin Dong
    [J]. Petroleum Science, 2024, (02) : 1149 - 1170
  • [3] Study on dynamic transport characteristics of cuttings during drilling and washing of long horizontal wells
    Mao, Liangjie
    Yang, Pengfei
    Cai, Mingjie
    [J]. PETROLEUM SCIENCE AND TECHNOLOGY, 2023, 42 (25) : 3915 - 3943
  • [4] Simulation study on cuttings transport of the wavy wellbore trajectory in the long horizontal wellbore
    Chen, Yufei
    Zhang, Hui
    Li, Jun
    Zhou, Yingcao
    Lu, Zongyu
    Ouyang, Yong
    Tan, Tianyi
    Liu, Kerou
    Wang, Xinrui
    Zhang, Geng
    [J]. JOURNAL OF PETROLEUM SCIENCE AND ENGINEERING, 2022, 215
  • [5] Study on Simulation Law of Cuttings Migration in Shale Gas Horizontal Wells
    Chen, Ye
    Zheng, Youcheng
    Zeng, Bo
    Fan, Yu
    Wu, Pengcheng
    Wang, Xudong
    Xia, Chengyu
    [J]. SCIENTIFIC PROGRAMMING, 2022, 2022
  • [6] Numerical modelling of cuttings transport with foam in horizontal wells
    Li, Y
    Kuru, E
    [J]. JOURNAL OF CANADIAN PETROLEUM TECHNOLOGY, 2003, 42 (10): : 54 - 61
  • [7] A Novel Approach of Cuttings Transport with Bubbles in Horizontal Wells
    Li, Yingying
    Jiang, Guancheng
    Li, Ling
    Xu, Weixing
    Zhao, Zhiheng
    [J]. NATURAL RESOURCES AND SUSTAINABLE DEVELOPMENT II, PTS 1-4, 2012, 524-527 : 1314 - 1317
  • [8] A visualization experiment of cuttings transport in underbalanced horizontal wells
    Wei, Na
    Meng, Yingfeng
    Li, Gao
    Zhu, Kuanliang
    Li, Yongjie
    Xu, Xiaofeng
    Xin, Chunyan
    [J]. Natural Gas Industry, 2014, 34 (01) : 80 - 85
  • [9] DRILLING CUTTINGS TRANSPORT IN HORIZONTAL WELLS WHILE AERATED DRILLING
    Rasul, Golam
    Hasan, Rashid
    Hassan, Ibrahim
    Butt, Stephen
    Rahman, Mohammad Azizur
    [J]. 4TH THERMAL AND FLUIDS ENGINEERING CONFERENCE, ASTFE 2019, 2019,
  • [10] Cuttings transport with gas in the highly-deviated horizontal wells
    College of Petroleum Engineering, Northeast Petroleum University, Daqing 163318, China
    [J]. Open Fuels Energy Sci. J., 2013, 1 (23-29):