On the Self-Scheduling of Cellular Base Station-Based Virtual Power Plants

被引:0
|
作者
Yong, Pei [1 ]
Yang, Zhifang [1 ]
Zhang, Ning [2 ]
Kang, Chongqing [2 ]
机构
[1] Chongqing Univ, State Key Lab Power Transmiss Equipment Technol, Chongqing 400044, Peoples R China
[2] Tsinghua Univ, Dept Elect Engn, State Key Lab Power Syst, Beijing 100084, Peoples R China
来源
IEEE INTERNET OF THINGS JOURNAL | 2024年 / 11卷 / 14期
关键词
Power systems; Cooling; Base stations; Scheduling; Reliability; Power system reliability; Internet of Things; Cellular base station (CBS); cooling demand; energy storage; scheduling; virtual power plant (VPP); ENERGY; OPTIMIZATION; STRATEGY; MODEL;
D O I
10.1109/JIOT.2024.3382353
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
Constructing virtual power plants (VPPs) based on cellular base stations (CBSs) can effectively enable the CBSs to participate in power system operations. Then, like VPPs constructed by other distributed resources, it is essential for CBS-based VPPs to conduct self-scheduling at the day-ahead stage. However, the operational flexibility of CBS-based VPPs has yet to be systematically investigated, so the dispatch potential cannot be fully explored. This article proposes a self-scheduling framework based on the device-level modeling of CBS operational flexibility. Both the DC part and the AC part of CBSs are systematically studied. In the scheduling framework, the backup storage units at the DC part are arranged to utilize the spare capacity to conduct temporal arbitrage while guaranteeing the power supply reliability requirement; the cooling infrastructures at the AC part are dispatched with optimized schemes with temperature prerequisites. The synergy effect improves the scheduling of CBS-based VPPs and reduces operation costs. Case studies validate the proposed framework.
引用
收藏
页码:24511 / 24522
页数:12
相关论文
共 50 条
  • [1] Two-Stage Minimax Regret-Based Self-Scheduling Strategy for Virtual Power Plants
    Wang, Han
    Jia, Youwei
    Lai, Chun Sing
    Xie, Peng
    Shi, Mengge
    [J]. 2021 IEEE POWER & ENERGY SOCIETY GENERAL MEETING (PESGM), 2021,
  • [2] Self-Scheduling Virtual Power Plant for Peak Management
    Shokouhinejad, Hossein
    Guerra, Eduardo Castillo
    [J]. ENERGIES, 2024, 17 (11)
  • [3] Base Station-based Underwater Communication Network
    Ko, Haklim
    Lee, Hojun
    Cha, Minhyuk
    Kim, Seongho
    Kim, Seyeon
    Im, Taeho
    [J]. OCEANS 2023 - LIMERICK, 2023,
  • [4] A self-scheduling strategy of virtual power plant with electric vehicles considering margin indexes
    Jiao, Fengshun
    Deng, Yongsheng
    Li, Duo
    Wei, Bo
    Yue, Chengyan
    Cheng, Meng
    Zhang, Yapeng
    Zhang, Jiarui
    [J]. ARCHIVES OF ELECTRICAL ENGINEERING, 2020, 69 (04) : 907 - 920
  • [5] Day-Ahead Market Self-Scheduling of a Virtual Power Plant under Uncertainties
    Al-Zibak, Obada Ghassan
    Al-Jibreen, Khalid Sulaiman
    Al-Ismail, Fahad Saleh
    [J]. 2021 INTERNATIONAL CONFERENCE ON SUSTAINABLE ENERGY AND FUTURE ELECTRIC TRANSPORTATION (SEFET), 2021,
  • [6] Virtual reference station-based computerized ionospheric tomography
    Lu, Weijun
    Ma, Guanyi
    Wan, Qingtao
    Li, Jinghua
    Wang, Xiaolan
    Fu, Weizheng
    Maruyama, Takashi
    [J]. GPS SOLUTIONS, 2020, 25 (01)
  • [7] Virtual reference station-based computerized ionospheric tomography
    Weijun Lu
    Guanyi Ma
    Qingtao Wan
    Jinghua Li
    Xiaolan Wang
    Weizheng Fu
    Takashi Maruyama
    [J]. GPS Solutions, 2021, 25
  • [8] Optimal self-scheduling of a tidal power plant
    de la Torre, S
    Conejo, AJ
    [J]. JOURNAL OF ENERGY ENGINEERING, 2005, 131 (01) : 26 - 51
  • [9] Self-Scheduling of Joint Wind Power and NaS Battery Plants in Spinning Reserve and Energy Markets
    Tahmasebi, Mehrdad
    Pasupuleti, Jagadeesh
    [J]. JOURNAL OF ELECTRICAL SYSTEMS, 2014, 10 (02) : 156 - 167
  • [10] Robust optimisation for self-scheduling and bidding strategies of hybrid CSP-fossil power plants
    Pousinho, H. M. I.
    Contreras, J.
    Pinson, P.
    Mendes, V. M. F.
    [J]. INTERNATIONAL JOURNAL OF ELECTRICAL POWER & ENERGY SYSTEMS, 2015, 67 : 639 - 650